Cornwall: housing land supply, local plan and appeals

Cornwall Council says it can show a 3.9-year supply of housing land, at 31 March 2026, measured against standard method local housing need (4,421 homes a year) plus a shortfall of 2,069 homes; the 2016 Local Plan requirement is no longer used, short of the five years national policy asks for.

The 12 most recent appeal decisions that dealt with land supply, from 9 September 2026 to 11 November 2026, all found the council could not show five years.

It scored 94% in the 2025 Housing Delivery Test, and the government's results list an action plan as the consequence.

Its local plan, the Cornwall Local Plan: Strategic Policies 2010-2030, was adopted on 21 February 2023. A replacement, the Cornwall Local Plan 2050, is at the scoping consultation, with adoption expected on 23 June 2029.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Cornwall Council's latest published position is a 3.9-year supply of deliverable housing land for the period 2026/27 to 2030/31, made up of 20,057 homes it expects on deliverable sites. It is measured against standard method local housing need (4,421 homes a year) plus a shortfall of 2,069 homes; the 2016 Local Plan requirement is no longer used.

Other councils in the South West

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published 2026-08. Checked 2026-11-12 (7 days ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Cornwall where the inspector dealt with land supply, and what each one found.

  1. Five years not shownNot disputed11 November 2026 - appeal dismissed
    'Briar Cottage', Helston Water, Bissoe
    “The Council accepts that it cannot demonstrate a five-year housing land supply and so, in this case, the proposal would result in one new dwelling towards the Council's under supply of housing”
  2. Five years not shownNot disputed11 November 2026 - appeal dismissed
    Land West Of Northern Lights, Newton Moor, Troon
    “The Council accepts that it cannot demonstrate a five-year housing land supply and so, in this case, the proposal would provide between two and four new dwellings towards the Council's under supply of housing.”
  3. Five years not shownNot disputed11 November 2026 - appeal dismissed
    Land Adj To Treslothan View, Tolcarne Road, Camborne
    “Given that the Council cannot demonstrate a five-year housing land supply, and that the proposal would provide between one and two dwellings, this exception is relevant.”
  4. Five years not shownDisputed2 November 2026 - appeal dismissed
    Land South Of Whytegates, Reen, Perranporth
    “That being the case, those development plan policies related to the location of housing are not fully consistent with the parts of the Framework that seek to ensure the delivery of a sufficient supply of homes.”
  5. Five years not shownNot disputed29 October 2026 - appeal allowed
    Springlily, Steppy Downs Road, St Erth Praze
    “it is understood that the Council cannot currently demonstrate a five-year housing land supply.”
  6. Five years not shownDisputed29 October 2026 - appeal dismissed
    Land South of 51 Polisken Way, Polisken Way, St Erme
    “That being the case, those development plan policies related to the location of housing are not fully consistent with the parts of the Framework that seek to ensure the delivery of a sufficient supply of homes.”
  7. Five years not shownNot disputed29 October 2026 - appeal dismissed
    London Inn Apartments, 34 Fore Street, Redruth
    “In this case both parties accept that the Council cannot demonstrate a five-year housing land supply and so a new dwelling would contribute to this need.”
  8. Five years not shownDisputed23 October 2026 - appeal allowed
    Land East of Mevagissey School, School Hill, Mevagissey
    “the evidence indicates that the Council can demonstrate 3.8 years housing land supply.”
    Figures given: council 3.8 years. Decision 6008517

Showing the 8 most recent of 57 decisions in Cornwall that dealt with land supply. Planther searches and reads all of them for a site.

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Cornwall scored 94% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: Action plan.

YearHomes neededHomes delivered
2022 to 20232,6472,761
2023 to 20242,6472,481
2024 to 20252,6472,251

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Cornwall Local Plan: Strategic Policies 2010-2030, Cornwall Site Allocations Development Plan Document, Cornwall Climate Emergency Development Plan Document, Cornwall Minerals Safeguarding Development Plan Document and Saved policies of the former Caradon, Carrick, North Cornwall, Penwith and Restormel local plans and of the Cornwall Minerals Local Plan 1998 (listed in the council's saved policies document), adopted on 21 February 2023.

Eighty-one made neighbourhood plans; Callington and Kelly Bray passed its referendum on 5 November 2026 and is waiting to be made.

The Cornwall Local Plan 2050

Being prepared under the plan-making system introduced in 2026, which runs each plan through three gateways in about 30 months.

Now at scoping consultation, step 2 of 9. Adoption expected on 23 June 2029, 2 years and 7 months away.

  1. Notice of intention30 Apr 2026
  2. NowScoping consultation5 Oct 2026
  3. Gateway 125 Jan 2027
  4. Content and evidence consultation10 May 2027
  5. Gateway 213 Sep 2027
  6. Plan consultation13 Mar 2028
  7. Gateway 33 July 2028
  8. Examination11 Nov 2028
  9. Adoption23 June 2029
  1. Notice of intention30 Apr 2026
  2. Scoping consultationNow5 Oct 2026
  3. Gateway 125 Jan 2027
  4. Content and evidence consultation10 May 2027
  5. Gateway 213 Sep 2027
  6. Plan consultation13 Mar 2028
  7. Gateway 33 July 2028
  8. Examination11 Nov 2028
  9. Adoption23 June 2029

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-11-15 (4 days ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 2,054 appeals against Cornwall's decisions and allowed 639 of them (31%), against 31% across all councils. For major schemes, 51 of 104 were allowed (49%, against 50% across all councils).

YearDecidedAllowedShare allowed
201920955 (26%)
202016843 (26%)
202116753 (32%)
202214752 (35%)
202321366 (31%)
202418154 (30%)
2025267105 (39%)
202614344 (31%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Cornwall's own pages

Land supply around Cornwall

Basingstoke and Deane: 3.2 yearsBath and North East Somerset: 2.5 yearsBournemouth, Christchurch and Poole: 2.55 yearsBristol: 4.14 yearsCheltenham: 3.12 yearsCherwell: 3.1 yearsCornwall: 3.9 yearsCotswold: 1.8 yearsDorset: 2.53 yearsEast Devon: 3.5 yearsEastleigh: 4.2 yearsExeter: 5.29 yearsForest of Dean: No current figure publishedGloucester: 3.1 yearsHerefordshire: 2.81 yearsIsle of Wight: No current figure publishedIsles of Scilly: Says it cannot show five yearsMalvern Hills: 5.48 yearsMid Devon: 2.4 yearsNew Forest: 1.53 yearsNorth Devon: 4.61 yearsNorth Somerset: 5.05 yearsPlymouth: 2.33 yearsSomerset: No current figure publishedSouth Gloucestershire: 3.93 yearsSouth Hams: 2.33 yearsSouthampton: No current figure publishedStratford-on-Avon: 2.43 yearsStroud: No current figure publishedSwindon: 4.9 yearsTeignbridge: No current figure publishedTest Valley: 2.54 yearsTewkesbury: 3.65 yearsTorbay: 1.65 yearsTorridge: 4.61 yearsVale of White Horse: 5.51 yearsWest Berkshire: 5.7 yearsWest Devon: 2.33 yearsWest Oxfordshire: Says it cannot show five yearsWiltshire: No current figure publishedWinchester: No current figure publishedWychavon: 5.48 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Cornwall

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Cornwall from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.