Swindon: housing land supply, local plan and appeals

Swindon Council says it can show a 4.9-year supply of housing land, at 1 April 2025, measured against local housing need under the standard method (the Local Plan 2026 is more than five years old), short of the five years national policy asks for.

The 12 most recent appeal decisions that dealt with land supply, from 27 January 2025 to 1 July 2026, all found the council could not show five years.

It scored 87% in the 2025 Housing Delivery Test, and the government's results list an action plan as the consequence.

Its local plan, the Swindon Borough Local Plan 2026 (adopted 26 March 2015), was adopted on 26 March 2015. A replacement, the Swindon Local Plan 2043, is at Regulation 19.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Swindon Council's latest published position is a 4.9-year supply of deliverable housing land for the period 2025/26 to 2029/30, made up of 6,146 homes it expects on deliverable sites. It is measured against local housing need under the standard method (the Local Plan 2026 is more than five years old).

This is the latest figure the council has published. Its base date is 1 April 2025, more than 18 months ago.

Other councils in the South West

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published 2025-07-24. Checked 2026-10-04 (7 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Swindon where the inspector dealt with land supply, and what each one found.

  1. Five years not shownNot disputed1 July 2026 - appeal allowed
    Land adjacent to Lynt Road, Inglesham, Swindon
    “the Council cannot demonstrate a five-year supply of deliverable housing sites”
    Figures given: council 4.9 years. Decision 6005705
  2. Five years not shownNot disputed4 March 2026 - appeal dismissed
    Land at Mill Lane, Swindon, Wiltshire
    “The tilted balance of the National Planning Policy Framework is engaged, due to the lack of a five-year Borough housing land supply.”
  3. Five years not shownNot disputed7 November 2025 - appeal dismissed
    Land at Moorleaze Farm, Wanborough, Swindon
    “The Council is currently unable to demonstrate a five-year supply of deliverable housing sites.”
  4. Five years not shownNot disputed13 October 2025 - appeal dismissed
    58 Western Street, Old Town, Swindon
    “the Council acknowledges that it is currently unable to demonstrate a 5-year housing land supply. Accordingly, paragraph 11 (d) of the National Planning Policy Framework (the Framework) is engaged”
  5. Five years not shownNot disputed6 August 2025 - appeal dismissed
    260 Ferndale Road, Swindon
    “The evidence indicates that the Council's current housing land supply falls below the housing requirement for the five-year period by a modest degree.”
  6. Five years not shownNot disputed17 July 2025 - appeal dismissed
    Land adjacent to 14 Matley Moor, SWINDON
    “the Council's current housing land supply falls marginally below the housing requirement for the five-year period (at 4.87 years)”
    Figures given: inspector 4.87 years. Decision 3363294
  7. Five years not shownNot disputed20 June 2025 - appeal allowed
    Golden Star, 1 Blair Parade, Moredon Road, SWINDON
    “The Council accepts that it is unable to demonstrate a 5-year housing land supply.”
  8. Five years not shownNot disputed20 June 2025 - appeal dismissed
    25 Wharf Road, Wroughton, Swindon
    “I am aware that the Council is unable to demonstrate a 5-year housing land supply.”

Showing the 8 most recent of 17 decisions in Swindon that dealt with land supply. Planther searches and reads all of them for a site.

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Swindon scored 87% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: Action plan.

YearHomes neededHomes delivered
2022 to 20231,0241,008
2023 to 2024999720
2024 to 20251,005892

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Swindon Borough Local Plan 2026 (adopted 26 March 2015), Swindon Central Area Action Plan (2009), Wiltshire and Swindon Minerals and Waste plans (2009 to 2013), including the Waste Site Allocations Local Plan (2013), and saved Policy 35 of the Minerals Local Plan 2001 and Seven made neighbourhood plans, adopted on 26 March 2015, covering 2011 to 2026.

Seven made neighbourhood plans: Wroughton, Highworth, South Marston, Hannington, Stratton St Margaret, Blunsdon East and Chiseldon.

The Swindon Local Plan 2043

Being prepared under the plan-making system in place before 2026.

Now at regulation 19 consultation, step 3 of 7.

  1. Early preparation
  2. Regulation 18 consultation1 Sep 2025
  3. NowRegulation 19 consultation24 Sep 2026
  4. SubmittedDec 2026
  5. Examination hearings
  6. Main modifications
  7. Adoption
  1. Early preparation
  2. Regulation 18 consultation1 Sep 2025
  3. Regulation 19 consultationNow24 Sep 2026
  4. SubmittedDec 2026
  5. Examination hearings
  6. Main modifications
  7. Adoption

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-10-04 (7 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 338 appeals against Swindon's decisions and allowed 107 of them (32%), against 31% across all councils. For major schemes, 2 of 7 were allowed (29%, against 50% across all councils).

YearDecidedAllowedShare allowed
2019266 (23%)
2020369 (25%)
2021388 (21%)
20223312 (36%)
20233513 (37%)
20243414 (41%)
2025325 (16%)
2026137 (54%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Swindon's own pages

Land supply around Swindon

Basingstoke and Deane: 3.2 yearsBath and North East Somerset: 2.5 yearsBuckinghamshire: 0.86 yearsCheltenham: 3.12 yearsCherwell: 3.1 yearsCotswold: 1.8 yearsForest of Dean: No current figure publishedGloucester: 3.1 yearsHart: 2.07 yearsHerefordshire: 2.81 yearsOxford: 2.88 yearsReading: 3.55 yearsSomerset: No current figure publishedSouth Gloucestershire: 3.93 yearsSouth Oxfordshire: 4.46 yearsStroud: No current figure publishedSwindon: 4.9 yearsTest Valley: 2.54 yearsTewkesbury: 3.65 yearsVale of White Horse: 5.51 yearsWest Berkshire: 5.7 yearsWest Oxfordshire: Says it cannot show five yearsWiltshire: No current figure publishedWokingham: 2.5 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Swindon

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Swindon from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.