The development plan is the Gloucester, Cheltenham and Tewkesbury Joint Core Strategy (2017), Gloucester City Plan (2023), City of Gloucester Local Plan (1983) - saved retail policies S1e, S2b, S3, S3a, S3b only and Gloucestershire Minerals Local Plan (2020) and Waste Core Strategy (2012), the county's plans, adopted on 26 January 2023, covering 2011 to 2031.
No made neighbourhood plans; Hempsted is the only designated area, with no active forum.
The Cheltenham, Gloucester and Tewkesbury Strategic and Local Plan (CGTSLP)
Being prepared under the plan-making system in place before 2026.
Now at regulation 18 consultation, step 2 of 7.
- Early preparation
- NowRegulation 18 consultationJan 2024
- Regulation 19 consultation
- Submitted
- Examination hearings
- Main modifications
- Adoption
Early preparation
Regulation 18 consultationNowJan 2024
Regulation 19 consultation
Submitted
Examination hearings
Main modifications
Adoption
Dates from the council's published timetable, its local development scheme.
Source: the council's local plan pages. Checked 2026-10-04 (7 weeks ago). Every council: where each local plan has got to.