Northumberland Council says it can show a 7-year supply of housing land, at 31 March 2026.

The two most recent appeal decisions that dealt with land supply, from 15 April 2026 to 28 October 2026, both found the council could show five years.

It scored 262% in the 2025 Housing Delivery Test, with no consequence listed.

Its local plan, the Northumberland Local Plan 2016-2036, was adopted on 31 March 2022. A replacement, the Northumberland Local Plan 2025-2045, is at Gateway 1, with adoption expected on 14 March 2029.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Northumberland Council's latest published position is a 7-year supply of deliverable housing land for the period 2026 to 2031.

The council's statement also says that for decisions from 1 July 2026 a 20% buffer applies, which gives 6.1 years.

Other councils in the North East

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement. Checked 2026-10-26 (3 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Northumberland where the inspector dealt with land supply, and what each one found.

  1. Five years shownNot disputed28 October 2026 - appeal dismissed
    Land North West of Ivy Cottage, Whittonstall
    “Given the Council's demonstrated five-year housing land supply and Housing Delivery Test performance, the criteria within footnote 41 are not engaged.”
  2. Five years shownNot disputed15 April 2026 - appeal dismissed
    Middle Moor Farm, Middle Moor Farm Drive, Longhirst, Morpeth, Northumberland
    “the evidence before me is that the Council can demonstrate a five-year supply of deliverable housing sites and has met its required housing delivery over the last three years”

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Northumberland scored 262% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: None.

YearHomes neededHomes delivered
2022 to 20236161,594
2023 to 20245611,512
2024 to 20255491,424

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Northumberland Local Plan 2016-2036 and Made neighbourhood plans (32), plus the Blyth Neighbourhood Plan, which passed referendum on 10 September 2026, adopted on 31 March 2022, covering 2016 to 2036. It replaced 13 earlier plans, including the Alnwick District Core Strategy (2007).

32 made neighbourhood plans; Blyth passed its referendum in September 2026 and Alnwick and Denwick's review is at examination.

The Northumberland Local Plan 2025-2045

Being prepared under the plan-making system introduced in 2026, which runs each plan through three gateways in about 30 months.

Now at gateway 1, step 3 of 9. Adoption expected on 14 March 2029, 2 years and 4 months away.

  1. Notice of intention16 Apr 2026
  2. Scoping consultation20 May 2026
  3. NowGateway 19 Sep 2026
  4. Content and evidence consultation28 Apr 2027
  5. Gateway 210 Nov 2027
  6. Plan consultation29 Feb 2028
  7. Gateway 319 July 2028
  8. Examination14 Sep 2028
  9. Adoption14 Mar 2029
  1. Notice of intention16 Apr 2026
  2. Scoping consultation20 May 2026
  3. Gateway 1Now9 Sep 2026
  4. Content and evidence consultation28 Apr 2027
  5. Gateway 210 Nov 2027
  6. Plan consultation29 Feb 2028
  7. Gateway 319 July 2028
  8. Examination14 Sep 2028
  9. Adoption14 Mar 2029

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-10-26 (3 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 707 appeals against Northumberland's decisions and allowed 165 of them (23%), against 31% across all councils. For major schemes, 14 of 31 were allowed (45%, against 50% across all councils).

YearDecidedAllowedShare allowed
20198515 (18%)
20207620 (26%)
20215913 (22%)
20226912 (17%)
20236021 (35%)
20248423 (27%)
20257521 (28%)
20266513 (20%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Northumberland's own pages

Land supply around Northumberland

Blackburn with Darwen: 5.7 yearsBlackpool: 2.1 yearsBradford: 3.59 yearsBurnley: 12.3 yearsBury: 4.3 yearsCalderdale: 3.89 yearsChorley: 3.4 yearsCounty Durham: 3.92 yearsCumberland: 2.5 yearsDarlington: 5.4 yearsDoncaster: 6.35 yearsEast Riding of Yorkshire: No current figure publishedFylde: 4.35 yearsGateshead: 2.61 yearsHartlepool: 5 yearsHyndburn: 5.91 yearsKingston upon Hull: 3.16 yearsKirklees: 4.18 yearsLancaster: 2 yearsLeeds: 6.4 yearsMiddlesbrough: 5.2 yearsNewcastle upon Tyne: No current figure publishedNorth Lincolnshire: No current figure publishedNorth Tyneside: 2.82 yearsNorth Yorkshire: 2.26 yearsNorthumberland: 7 yearsPendle: 5.32 yearsPreston: 5.48 yearsRedcar and Cleveland: 3.62 yearsRibble Valley: 2.24 yearsRochdale: 5.2 yearsRossendale: 5.3 yearsSefton: 3.34 yearsSouth Ribble: 5.53 yearsSouth Tyneside: Says it cannot show five yearsStockton-on-Tees: 4 yearsSunderland: 4.5 yearsWakefield: 5.5 yearsWest Lancashire: 2.49 yearsWestmorland and Furness: 3.17 yearsWyre: 8.36 yearsYork: No current figure published
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Northumberland

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Northumberland from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.