Stockton-on-Tees: housing land supply, local plan and appeals

Stockton-on-Tees Council says it can show a 4-year supply of housing land, at 1 April 2025, measured against local housing need (Local Plan over five years old), short of the five years national policy asks for.

The four most recent appeal decisions that dealt with land supply, from 29 April 2025 to 5 August 2026, all found the council could not show five years.

It scored 152% in the 2025 Housing Delivery Test, with no consequence listed.

Its local plan, the Stockton-on-Tees Local Plan, was adopted on 30 January 2019. A replacement, the Stockton-on-Tees Local Plan (new), is at the scoping consultation.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Stockton-on-Tees Council's latest published position is a 4-year supply of deliverable housing land for the period 2025/26 to 2029/30, made up of 3,326 homes it expects on deliverable sites. It is measured against local housing need (Local Plan over five years old).

This is the latest figure the council has published. Its base date is 1 April 2025, more than 18 months ago.

Other councils in the North East

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published October 2025. Checked 2026-10-24 (4 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Stockton-on-Tees where the inspector dealt with land supply, and what each one found.

  1. Five years not shownNot disputed5 August 2026 - appeal allowed
    Little Meadows, Elton, STOCKTON-ON-TEES
    “The Council is unable to demonstrate a 5-year supply of deliverable housing land. Paragraph 11(d)(ii) of the Framework is therefore triggered”
  2. Five years not shownNot disputed23 January 2026 - appeal allowed
    Land at Wynyard Village
    “Taking into account the 5-year supply requirement of 4153, the Council can currently demonstrate only a 4 year supply of deliverable housing sites.”
    Figures given: council 4 years, inspector 4 years. Decision 3352732
  3. Five years not shownNot disputed22 August 2025 - appeal dismissed
    Land south of Woodland View, The Green, Egglescliffe, STOCKTON-ON-TEES
    “The Council is only able to demonstrate 4.33 years supply of deliverable housing sites.”
    Figures given: council 4.33 years, inspector 4.33 years. Decision 3362277
  4. Five years not shownNot disputed29 April 2025 - appeal allowed
    Land Adjacent to Low Lane and Thornaby Road, Ingleby Barwick
    “by refusing to grant planning permission on this and other allocated sites, the Council has potentially reduced that level of supply to below five-years.”

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Stockton-on-Tees scored 152% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: None.

YearHomes neededHomes delivered
2022 to 2023461623
2023 to 2024443666
2024 to 2025444764

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Stockton-on-Tees Local Plan, Tees Valley Minerals and Waste Core Strategy DPD and Tees Valley Minerals and Waste Policies and Sites DPD, adopted on 30 January 2019, covering 2017 to 2032. It replaced 3 earlier plans, including the Stockton-on-Tees Core Strategy 2010.

Two neighbourhood areas designated (Eaglescliffe and Egglescliffe, Wynyard); none made yet.

The Stockton-on-Tees Local Plan (new)

Being prepared under the plan-making system introduced in 2026, which runs each plan through three gateways in about 30 months.

Now at scoping consultation, step 2 of 9. Adoption expected: 2029.

  1. Notice of intention5 Aug 2026
  2. NowScoping consultation23 Oct 2026
  3. Gateway 117 Mar 2027
  4. Content and evidence consultation17 Sep 2027
  5. Gateway 2
  6. Plan consultation27 Oct 2028
  7. Gateway 3
  8. ExaminationMar 2029
  9. Adoption2029
  1. Notice of intention5 Aug 2026
  2. Scoping consultationNow23 Oct 2026
  3. Gateway 117 Mar 2027
  4. Content and evidence consultation17 Sep 2027
  5. Gateway 2
  6. Plan consultation27 Oct 2028
  7. Gateway 3
  8. ExaminationMar 2029
  9. Adoption2029

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-10-24 (4 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 258 appeals against Stockton-on-Tees's decisions and allowed 86 of them (33%), against 31% across all councils. For major schemes, 10 of 19 were allowed (53%, against 50% across all councils).

YearDecidedAllowedShare allowed
2019398 (21%)
20203011 (37%)
20212514 (56%)
2022207 (35%)
2023133 (23%)
2024142 (14%)
2025245 (21%)
2026133 (23%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Stockton-on-Tees's own pages

Land supply around Stockton-on-Tees

County Durham: 3.92 yearsDarlington: 5.4 yearsHartlepool: 5 yearsMiddlesbrough: 5.2 yearsNorth Yorkshire: 2.26 yearsNorthumberland: 7 yearsRedcar and Cleveland: 3.62 yearsStockton-on-Tees: 4 yearsSunderland: 4.5 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Stockton-on-Tees

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Stockton-on-Tees from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.