Rotherham: housing land supply, local plan and appeals

Rotherham Council says it can show a 4.4-year supply of housing land, at 1 April 2025, short of the five years national policy asks for.

It scored 139% in the 2025 Housing Delivery Test, with no consequence listed.

Its local plan, the Rotherham Core Strategy 2014, was adopted on 27 June 2018. A replacement, the Rotherham Local Plan review, is in early preparation.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Rotherham Council's latest published position is a 4.4-year supply of deliverable housing land.

Page titled 'Five-year housing land supply' states latest position covers 1 April 2025 to 31 March 2030, with 4.4 years supply identified, based on revised standard method from 12 Dec 2024.

This is the latest figure the council has published. Its base date is 1 April 2025, more than 18 months ago.

Other councils in the Yorkshire and the Humber

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement. Checked .

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Rotherham where the inspector dealt with land supply, and what each one found.

  1. Five years shownNot disputed11 July 2024 - appeal dismissed
    Land south of Taylor Drive, Woodsetts, Rotherham
    “It is also uncontested that the Council can demonstrate a healthy overall housing land supply of over 9.5 years”
    Figures given: council 9.5 years. Decision 3325674

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Rotherham scored 139% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: None.

YearHomes neededHomes delivered
2022 to 2023564745
2023 to 2024558784
2024 to 2025544784

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Rotherham Core Strategy 2014 and Rotherham Sites and Policies Document 2018, adopted on 27 June 2018.

The Rotherham Local Plan review

Being prepared under the plan-making system in place before 2026.

Now at early preparation, step 1 of 7. Adoption expected: 2029.

Regulation 18 consultation was due in October 2026. The council has not yet published it as done; its own page will say whether it happened on time.

  1. NowEarly preparation
  2. Regulation 18 consultationOct 2026
  3. Regulation 19 consultation2027-2028
  4. Submitted2028-winter
  5. Examination hearings
  6. Main modifications
  7. Adoption2029
  1. Early preparationNow
  2. Regulation 18 consultationOct 2026
  3. Regulation 19 consultation2027-2028
  4. Submitted2028-winter
  5. Examination hearings
  6. Main modifications
  7. Adoption2029

Dates from the council's published timetable, its local development scheme.

Source: the council's website. Checked 2026-08-03 (4 months ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 369 appeals against Rotherham's decisions and allowed 96 of them (26%), against 31% across all councils. For major schemes, 4 of 6 were allowed (67%, against 50% across all councils).

YearDecidedAllowedShare allowed
2019334 (12%)
2020236 (26%)
2021409 (23%)
20223011 (37%)
2023265 (19%)
20245011 (22%)
20254013 (33%)
2026275 (19%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Rotherham's own pages

Land supply around Rotherham

Amber Valley: 5.8 yearsAshfield: 3.86 yearsBarnsley: 2.9 yearsBassetlaw: 5.31 yearsBolsover: 4.82 yearsBradford: 3.59 yearsCalderdale: 3.89 yearsCheshire East: 3.3 yearsChesterfield: 3.46 yearsDerbyshire Dales: No current figure publishedDoncaster: 6.35 yearsEast Riding of Yorkshire: No current figure publishedGedling: 3.73 yearsHigh Peak: 2.47 yearsKirklees: 4.18 yearsLeeds: 6.4 yearsLincoln: 7.1 yearsMansfield: 5.53 yearsNewark and Sherwood: 4.02 yearsNorth East Derbyshire: 4.47 yearsNorth Kesteven: 7.1 yearsNorth Lincolnshire: No current figure publishedNorth Yorkshire: 2.26 yearsOldham: 6.7 yearsRochdale: 5.2 yearsRotherham: 4.4 yearsSheffield: No current figure publishedStaffordshire Moorlands: 2.95 yearsStockport: 1.77 yearsTameside: 5.35 yearsWakefield: 5.5 yearsWest Lindsey: 7.1 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Rotherham

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Rotherham from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.