Enfield: housing land supply, local plan and appeals

Enfield Council says it can show a 3.1-year supply of housing land, at 1 April 2024, measured against London Plan 2021 housing target for Enfield (1,246 homes a year), short of the five years national policy asks for.

The 12 most recent appeal decisions that dealt with land supply, from 12 June 2025 to 6 August 2026, all found the council could not show five years.

It scored 77% in the 2025 Housing Delivery Test, and the government's results list a 20% buffer as the consequence.

Its local plan, the London Plan 2021 (Greater London Authority), was adopted on 13 July 2022. A replacement, the Enfield Local Plan 2019-2041, is at examination.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Enfield Council's latest published position is a 3.1-year supply of deliverable housing land for the period 2024/25 to 2028/29, made up of 4,641 homes it expects on deliverable sites. It is measured against London Plan 2021 housing target for Enfield (1,246 homes a year).

This is the latest figure the council has published. Its base date is 1 April 2024, more than 18 months ago.

Other councils in London

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published Authority Monitoring Report 2023/24. Checked 2026-10-26 (3 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Enfield where the inspector dealt with land supply, and what each one found.

  1. Five years not shownNot disputed6 August 2026 - appeal dismissed
    28 The Crest, London
    “As the Council cannot demonstrate a five year supply of deliverable housing sites, Paragraph 11(d) of the National Planning Policy Framework (the Framework) is therefore engaged.”
  2. Five years not shownNot disputed6 July 2026 - appeal dismissed
    56B, 56C, 56D, 56E Tenniswood Road, Enfield
    “The Council accepts it cannot demonstrate a 5 year housing land supply, so Framework paragraph 11 d) is engaged.”
  3. Five years not shownNot disputed30 June 2026 - appeal dismissed
    4 Bramley Road, LONDON
    “The Council does not dispute that it cannot demonstrate a five-year housing land supply.”
  4. Five years not shownNot disputed19 March 2026 - appeal dismissed
    2 COTTAGE, DONKEY LANE, ENFIELD
    “The Council accepts that it cannot demonstrate a five-year supply of deliverable housing sites, with the evidence indicating a substantial shortfall against the requirement.”
  5. Five years not shownNot disputed17 March 2026 - appeal dismissed
    72 VICTORIA ROAD, London
    “The Council accepts that it cannot demonstrate a five-year supply of deliverable housing sites, and the officer's report indicates that the shortfall is substantial”
  6. Five years not shownNot disputed13 March 2026 - appeal dismissed
    69 Barrowell Green, LONDON
    “The Council acknowledges that its housing land supply position is such that this "presumption in favour of sustainable development" applies here.”
  7. Five years not shownNot disputed11 March 2026 - appeal dismissed
    Land adj to 2 Bilton Way, Enfield, Middlesex
    “The Council has confirmed that there is a shortfall in the housing land supply”
  8. Five years not shownNot disputed21 January 2026 - appeal dismissed
    62 Powys Lane, London
    “There is common ground between the main parties that the Council is unable to deliver a 5 year supply of housing land”

Showing the 8 most recent of 25 decisions in Enfield that dealt with land supply. Planther searches and reads all of them for a site.

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Enfield scored 77% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: 20% buffer.

YearHomes neededHomes delivered
2022 to 20231,246892
2023 to 20241,246872
2024 to 20251,2461,097

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the London Plan 2021 (Greater London Authority), Enfield Core Strategy 2010-2025 (adopted 10 November 2010), Development Management Document (adopted November 2014), North Circular Area Action Plan (adopted 8 October 2014), North East Enfield Area Action Plan (adopted June 2016), Edmonton Leeside Area Action Plan (adopted January 2020) and North London Waste Plan 2021-2036 (joint, adopted 13 July 2022), adopted on 13 July 2022, covering 2021 to 2036.

The Enfield Local Plan 2019-2041

Being prepared under the plan-making system in place before 2026.

Now at examination hearings, step 5 of 7.

  1. Early preparation
  2. Regulation 18 consultation
  3. Regulation 19 consultationMar 2024
  4. Submitted6 Aug 2024
  5. NowExamination hearings19 Mar 2026
  6. Main modifications
  7. Adoption
  1. Early preparation
  2. Regulation 18 consultation
  3. Regulation 19 consultationMar 2024
  4. Submitted6 Aug 2024
  5. Examination hearingsNow19 Mar 2026
  6. Main modifications
  7. Adoption

The Traveller Local Plan 2020-2041

Being prepared under the plan-making system in place before 2026.

Now at regulation 19 consultation, step 3 of 7.

  1. Early preparation
  2. Regulation 18 consultationSep 2024
  3. NowRegulation 19 consultationSep 2025
  4. Submitted
  5. Examination hearings
  6. Main modifications
  7. Adoption
  1. Early preparation
  2. Regulation 18 consultationSep 2024
  3. Regulation 19 consultationNowSep 2025
  4. Submitted
  5. Examination hearings
  6. Main modifications
  7. Adoption

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-10-26 (3 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 1,676 appeals against Enfield's decisions and allowed 534 of them (32%), against 31% across all councils. For major schemes, 9 of 18 were allowed (50%, against 50% across all councils).

YearDecidedAllowedShare allowed
201922472 (32%)
202013743 (31%)
202115452 (34%)
202214746 (31%)
202311340 (35%)
202412334 (28%)
202512336 (29%)
20266816 (24%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Enfield's own pages

Land supply around Enfield

Barking and Dagenham: No current figure publishedBarnet: No current figure publishedBexley: 6.02 yearsBrent: No current figure publishedBrentwood: 4.53 yearsBroxbourne: 2.13 yearsBuckinghamshire: 0.86 yearsCamden: 2.8 yearsCentral Bedfordshire: 3.93 yearsDacorum: 1.2 yearsDartford: 5.84 yearsEaling: 5 yearsEast Hertfordshire: 3.55 yearsEnfield: 3.1 yearsEpping Forest: No current figure publishedGreenwich: 3.02 yearsHackney: No current figure publishedHammersmith and Fulham: No current figure publishedHaringey: No current figure publishedHarlow: 4.9 yearsHarrow: 5.2 yearsHavering: 3 yearsHertsmere: No current figure publishedHillingdon: 2.5 yearsHounslow: No current figure publishedIslington: No current figure publishedKensington and Chelsea: 5 yearsLambeth: 4.21 yearsLewisham: No current figure publishedCity of London: 7.7 yearsNewham: No current figure publishedRedbridge: Says it cannot show five yearsRichmond upon Thames: 4.5 yearsSouthwark: No current figure publishedSt Albans: 1.12 yearsThree Rivers: 1.19 yearsThurrock: 1.02 yearsTower Hamlets: No current figure publishedUttlesford: 5.35 yearsWaltham Forest: 5.05 yearsWandsworth: 5.24 yearsWatford: 5.44 yearsWelwyn Hatfield: 1.8 yearsWestminster: 5.19 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Enfield

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Enfield from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.