Harrow: housing land supply, local plan and appeals

Harrow Council says it can show a 5.2-year supply of housing land, at 1 April 2026, measured against Harrow Local Plan 2021-2041 requirement (Policy SP03, 802 homes a year), with a 20% buffer under NPPF paragraph 78c because the requirement is below 80% of local housing need.

The most recent appeal decision that dealt with land supply, on 27 May 2026, found the council could show five years.

It scored 106% in the 2025 Housing Delivery Test, with no consequence listed.

Its local plan, the London Plan 2021, was adopted on 24 March 2026. A replacement, the West London Waste Plan (review), is at Regulation 19, with adoption expected in February 2028.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Harrow Council's latest published position is a 5.2-year supply of deliverable housing land for the period 2026/27 to 2030/31, made up of 5,013 homes it expects on deliverable sites. It is measured against Harrow Local Plan 2021-2041 requirement (Policy SP03, 802 homes a year), with a 20% buffer under NPPF paragraph 78c because the requirement is below 80% of local housing need.

Other councils in London

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published September 2026. Checked 2026-10-29 (3 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Harrow where the inspector dealt with land supply, and what each one found.

  1. Five years shownDisputed27 May 2026 - appeal dismissed
    43 Glanleam Road, STANMORE
    “the Council contend that they can demonstrate 6.4 years of deliverable sites and 101% of its latest housing requirement, there is nothing before me to indicate this is not the case”
    Figures given: council 6.4 years, inspector 6.4 years. Decision 3376270

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Harrow scored 106% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: None.

YearHomes neededHomes delivered
2022 to 2023803737
2023 to 2024803843
2024 to 2025803981

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the London Plan 2021, Harrow Local Plan 2021-2041 and West London Waste Plan 2015, adopted on 24 March 2026, covering 2021 to 2041. It replaced 4 earlier plans, including the Harrow Core Strategy.

No made neighbourhood plans and no designated neighbourhood areas or forums.

The West London Waste Plan (review)

Being prepared under the plan-making system in place before 2026.

Now at regulation 19 consultation, step 3 of 7. Adoption expected in February 2028, 1 year and 3 months away.

  1. Early preparation
  2. Regulation 18 consultation11 Dec 2025
  3. NowRegulation 19 consultation4 Aug 2026
  4. Submitted31 Dec 2026
  5. Examination hearings
  6. Main modifications
  7. AdoptionFeb 2028
  1. Early preparation
  2. Regulation 18 consultation11 Dec 2025
  3. Regulation 19 consultationNow4 Aug 2026
  4. Submitted31 Dec 2026
  5. Examination hearings
  6. Main modifications
  7. AdoptionFeb 2028

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-10-29 (3 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 1,496 appeals against Harrow's decisions and allowed 533 of them (36%), against 31% across all councils. For major schemes, 5 of 20 were allowed (25%, against 50% across all councils).

YearDecidedAllowedShare allowed
201920770 (34%)
202012644 (35%)
202112042 (35%)
202212140 (33%)
202316267 (41%)
202411448 (42%)
202510230 (29%)
20267622 (29%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Harrow's own pages

Land supply around Harrow

Barnet: No current figure publishedBracknell Forest: 3.53 yearsBrent: No current figure publishedBroxbourne: 2.13 yearsBuckinghamshire: 0.86 yearsCamden: 2.8 yearsDacorum: 1.2 yearsEaling: 5 yearsEast Hertfordshire: 3.55 yearsEnfield: 3.1 yearsEpping Forest: No current figure publishedGreenwich: 3.02 yearsHackney: No current figure publishedHammersmith and Fulham: No current figure publishedHaringey: No current figure publishedHarrow: 5.2 yearsHertsmere: No current figure publishedHillingdon: 2.5 yearsHounslow: No current figure publishedIslington: No current figure publishedKensington and Chelsea: 5 yearsLambeth: 4.21 yearsLewisham: No current figure publishedCity of London: 7.7 yearsNewham: No current figure publishedRichmond upon Thames: 4.5 yearsSlough: No current figure publishedSouthwark: No current figure publishedSpelthorne: 5.3 yearsSt Albans: 1.12 yearsThree Rivers: 1.19 yearsTower Hamlets: No current figure publishedWaltham Forest: 5.05 yearsWandsworth: 5.24 yearsWatford: 5.44 yearsWelwyn Hatfield: 1.8 yearsWestminster: 5.19 yearsWindsor and Maidenhead: 3.53 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Harrow

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Harrow from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.