Kensington and Chelsea: housing land supply, local plan and appeals

Kensington and Chelsea Council says it can show a 5-year supply of housing land, at 1 April 2025, measured against the Local Plan 2024 stepped requirement (250 homes a year, rising to 646), with past shortfall and a 20% buffer added: 2,994 homes over five years.

It scored 78% in the 2025 Housing Delivery Test, and the government's results list a 20% buffer as the consequence.

Its local plan, the Kensington and Chelsea Local Plan 2024, was adopted on 24 July 2024.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Kensington and Chelsea Council's latest published position is a 5-year supply of deliverable housing land for the period 2025/26 to 2029/30, made up of 3,015 homes it expects on deliverable sites. It is measured against the Local Plan 2024 stepped requirement (250 homes a year, rising to 646), with past shortfall and a 20% buffer added: 2,994 homes over five years.

This is the latest figure the council has published. Its base date is 1 April 2025, more than 18 months ago.

Other councils in London

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published Monitoring Report 2025. Checked 2026-11-02 (2 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Kensington and Chelsea where the inspector dealt with land supply, and what each one found.

  1. Five years not shownNot disputed31 May 2024 - appeal dismissed
    77 Holland Road, London
    “The appellant argues that the Council cannot demonstrate a five-year housing land supply. This is not disputed by the Council.”
  2. Five years not shownNot disputed2 October 2023 - appeal dismissed
    First, Second and Third Floor Flats, 136 Brompton Road, LONDON
    “The Council cannot demonstrate a five year supply of deliverable housing sites”

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Kensington and Chelsea scored 78% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: 20% buffer.

YearHomes neededHomes delivered
2022 to 2023448281
2023 to 2024448237
2024 to 2025250378

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Kensington and Chelsea Local Plan 2024 and The London Plan 2021, adopted on 24 July 2024, covering 2024 to 2044. It replaced the Kensington and Chelsea Local Plan 2019.

Two neighbourhood plans are made (Norland; St Quintin and Woodlands), and a replacement St Quintin plan is being prepared.

Source: the council's local plan pages. Checked 2026-11-02 (2 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 921 appeals against Kensington and Chelsea's decisions and allowed 373 of them (40%), against 31% across all councils. For major schemes, 5 of 8 were allowed (63%, against 50% across all councils).

YearDecidedAllowedShare allowed
201913046 (35%)
20205913 (22%)
20218028 (35%)
20227829 (37%)
20236927 (39%)
20248641 (48%)
20255726 (46%)
20262913 (45%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Kensington and Chelsea's own pages

Land supply around Kensington and Chelsea

Barnet: No current figure publishedBrent: No current figure publishedBromley: 1.93 yearsCamden: 2.8 yearsCroydon: 5.1 yearsEaling: 5 yearsGreenwich: 3.02 yearsHackney: No current figure publishedHammersmith and Fulham: No current figure publishedHaringey: No current figure publishedHarrow: 5.2 yearsHillingdon: 2.5 yearsHounslow: No current figure publishedIslington: No current figure publishedKensington and Chelsea: 5 yearsKingston upon Thames: 1.48 yearsLambeth: 4.21 yearsLewisham: No current figure publishedCity of London: 7.7 yearsMerton: 5.2 yearsNewham: No current figure publishedRichmond upon Thames: 4.5 yearsSouthwark: No current figure publishedSpelthorne: 5.3 yearsTower Hamlets: No current figure publishedWaltham Forest: 5.05 yearsWandsworth: 5.24 yearsWestminster: 5.19 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Kensington and Chelsea

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Kensington and Chelsea from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.