Kingston upon Thames: housing land supply, local plan and appeals

Kingston upon Thames Council says it can show a 1.48-year supply of housing land, at 1 March 2025, measured against London Plan Policy H1 target (964 homes a year) plus shortfall of 1,968 homes, short of the five years national policy asks for.

The 12 most recent appeal decisions that dealt with land supply, from 26 January 2026 to 6 October 2026, all found the council could not show five years.

It scored 66% in the 2025 Housing Delivery Test, and the government's results list the presumption in favour of sustainable development as the consequence.

Its local plan, the The London Plan (March 2021), was adopted on 17 April 2012. A replacement, the Kingston Local Plan 2028-2043, is at Regulation 19.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Kingston upon Thames Council's latest published position is a 1.48-year supply of deliverable housing land for the period 1 April 2024 to 31 March 2029, made up of 2,407 homes it expects on deliverable sites. It is measured against London Plan Policy H1 target (964 homes a year) plus shortfall of 1,968 homes.

This is the latest figure the council has published. Its base date is 1 March 2025, more than 18 months ago.

Other councils in London

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published 2025-07. Checked 2026-11-02 (2 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Kingston upon Thames where the inspector dealt with land supply, and what each one found.

  1. Five years not shownNot disputed6 October 2026 - appeal dismissed
    Onslow House First Floor Flat, 1 Crummock Chase, Surbiton
    “The Council cannot currently demonstrate a five-year housing land supply. There is, therefore, a significant shortfall in housing land.”
  2. Five years not shownNot disputed3 August 2026 - appeal dismissed
    Town End Pier, 68 High Street, Kingston Upon Thames
    “The Council is unable to demonstrate a five-year supply of housing.”
  3. Five years not shownNot disputed27 July 2026 - appeal allowed
    12 Hardman Road, Kingston upon Thames
    “the Council advises that it is unable to demonstrate a 5 year housing land supply”
  4. Five years not shownNot disputed12 June 2026 - appeal allowed
    21 The Roystons, Surbiton, Kingston Upon Thames, SURREY
    “the Council have indicated that they cannot demonstrate a five-year supply of deliverable housing land”
  5. Five years not shownNot disputed15 May 2026 - appeal dismissed
    25 Flat 8, Hook Road, Kingston Upon Thames
    “In Kingston Upon Thames, the Council cannot currently show a five year supply of deliverable housing sites.”
  6. Five years not shownNot disputed12 May 2026 - appeal dismissed
    Glanmire Farm, Rushett Lane, Malden Rushett, Chessington
    “The Council cannot demonstrate a five-year housing land supply.”
  7. Five years not shownNot disputed12 May 2026 - appeal dismissed
    Glanmire Farm, Rushett Lane, Malden Rushett, Chessington
    “I also note that the Council is unable to demonstrate a five-year supply of deliverable housing land.”
  8. Five years not shownNot disputed31 March 2026 - appeal dismissed
    Land at 1 Verona Drive, Tolworth
    “The Council cannot currently demonstrate a five-year supply of deliverable housing sites”

Showing the 8 most recent of 57 decisions in Kingston upon Thames that dealt with land supply. Planther searches and reads all of them for a site.

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Kingston upon Thames scored 66% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: Presumption in favour of sustainable development.

YearHomes neededHomes delivered
2022 to 2023964397
2023 to 20249641,041
2024 to 2025964457

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the The London Plan (March 2021), Core Strategy 2012, Kingston Town Centre Area Action Plan 2008 and South London Waste Plan 2022-2037, adopted on 17 April 2012, covering 2012 to 2027. It replaced the Unitary Development Plan 2005.

No made neighbourhood plans; North Kingston's forum is preparing one and Malden Rushett is a designated area only.

The Kingston Local Plan 2028-2043

Being prepared under the plan-making system in place before 2026.

Now at regulation 19 consultation, step 3 of 7. Adoption expected: 2028.

  1. Early preparation
  2. Regulation 18 consultation
  3. NowRegulation 19 consultation6 July 2026
  4. Submitted
  5. Examination hearings
  6. Main modifications
  7. Adoption2028
  1. Early preparation
  2. Regulation 18 consultation
  3. Regulation 19 consultationNow6 July 2026
  4. Submitted
  5. Examination hearings
  6. Main modifications
  7. Adoption2028

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-11-02 (2 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 782 appeals against Kingston upon Thames's decisions and allowed 288 of them (37%), against 31% across all councils. For major schemes, 5 of 16 were allowed (31%, against 50% across all councils).

YearDecidedAllowedShare allowed
20197126 (37%)
20204316 (37%)
20216516 (25%)
20227331 (42%)
20238332 (39%)
20248029 (36%)
20258231 (38%)
20264120 (49%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Kingston upon Thames's own pages

Land supply around Kingston upon Thames

Barking and Dagenham: No current figure publishedBarnet: No current figure publishedBexley: 6.02 yearsBracknell Forest: 3.53 yearsBrent: No current figure publishedBromley: 1.93 yearsBuckinghamshire: 0.86 yearsCamden: 2.8 yearsCroydon: 5.1 yearsEaling: 5 yearsElmbridge: 1 yearsEpsom and Ewell: Says it cannot show five yearsGreenwich: 3.02 yearsGuildford: 2.98 yearsHackney: No current figure publishedHammersmith and Fulham: No current figure publishedHarrow: 5.2 yearsHillingdon: 2.5 yearsHounslow: No current figure publishedIslington: No current figure publishedKensington and Chelsea: 5 yearsKingston upon Thames: 1.48 yearsLambeth: 4.21 yearsLewisham: No current figure publishedCity of London: 7.7 yearsMerton: 5.2 yearsMole Valley: 5.3 yearsNewham: No current figure publishedRedbridge: Says it cannot show five yearsReigate and Banstead: 4.08 yearsRichmond upon Thames: 4.5 yearsRunnymede: 2.89 yearsSevenoaks: 3.59 yearsSlough: No current figure publishedSouthwark: No current figure publishedSpelthorne: 5.3 yearsSurrey Heath: 7.71 yearsSutton: No current figure publishedTandridge: 2.17 yearsTower Hamlets: No current figure publishedWaltham Forest: 5.05 yearsWandsworth: 5.24 yearsWaverley: 1.28 yearsWestminster: 5.19 yearsWindsor and Maidenhead: 3.53 yearsWoking: 4.57 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Kingston upon Thames

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Kingston upon Thames from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.