Cheshire West and Chester: housing land supply, local plan and appeals

Cheshire West and Chester Council says it can show a 1.6-year supply of housing land, at 1 April 2026, measured against standard method local housing need (the adopted Local Plan requirement for 2010-2030 is already met), short of the five years national policy asks for.

The 12 most recent appeal decisions that dealt with land supply, from 3 July 2026 to 12 November 2026, all found the council could not show five years.

It scored 244% in the 2025 Housing Delivery Test, with no consequence listed.

Its local plan, the Cheshire West and Chester Local Plan (Part One) Strategic Policies, was adopted on 18 July 2019. A replacement, the Cheshire West and Chester Local Plan, is at the scoping consultation, with adoption expected on 1 December 2028.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Cheshire West and Chester Council's latest published position is a 1.6-year supply of deliverable housing land for the period 2026 to 2031, made up of 3,269 homes it expects on deliverable sites. It is measured against standard method local housing need (the adopted Local Plan requirement for 2010-2030 is already met).

Other councils in the North West

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published 2026-09. Checked 2026-10-04 (7 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Cheshire West and Chester where the inspector dealt with land supply, and what each one found.

  1. Five years not shownNot disputed12 November 2026 - appeal allowed
    Youds Croft, Proffits Lane, Helsby
    “the Council cannot demonstrate a 5 year supply of deliverable sites”
  2. Five years not shownNot disputed10 November 2026 - appeal dismissed
    Former Swimming Pool, Off Langdon Close, Norley
    “Both main parties agree that the Council cannot demonstrate a 5 year supply of deliverable housing sites. The appellant contends that the supply position is 1.89 years and the Council has not disputed this.”
  3. Five years not shownNot disputed10 November 2026 - appeal dismissed
    Former Car Park, off Blakemere Lane, Norley
    “the Council cannot demonstrate a 5 year supply of deliverable housing sites”
    Figures given: appellant 1.89 years. Decision 6012486
  4. Five years not shownNot disputed10 November 2026 - appeal dismissed
    Land off Ashton Road, Norley
    “Both main parties are in agreement that the Council cannot demonstrate a 5 year land supply of deliverable housing sites.”
    Figures given: appellant 1.89 years. Decision 6013119
  5. Five years not shownNot disputed10 November 2026 - appeal allowed
    Wood View, Blakemere Lane, Norley
    “The Council cannot demonstrate a 5 year supply of deliverable housing sites.”
    Figures given: appellant 1.89 years. Decision 6013121
  6. Five years not shownNot disputed6 November 2026 - appeal dismissed
    Land off Crabmill Lane, Crabmill Lane, Norley
    “It is also agreed that there is an evidenced unmet need for the type of development proposed, as the Council cannot demonstrate a 5 year supply of deliverable housing sites. Based on the information before me, I have no reason to take a dif”
  7. Five years not shownNot disputed9 October 2026 - appeal dismissed
    Land off Shire Way, Tattenhall
    “Both main parties agree that the Council cannot demonstrate a 5 year supply of housing land.”
    Figures given: appellant 1.89 years. Decision 6008560
  8. Five years not shownNot disputed28 September 2026 - appeal dismissed
    Land At Hillberry, Dalefords Lane, Marton, Cheshire
    “the Council does not currently have a 5-year housing land supply. The supply figure is just 1.6 years”
    Figures given: council 1.6 years, inspector 1.6 years. Decision 6012304

Showing the 8 most recent of 24 decisions in Cheshire West and Chester that dealt with land supply. Planther searches and reads all of them for a site.

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Cheshire West and Chester scored 244% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: None.

YearHomes neededHomes delivered
2022 to 20235601,399
2023 to 20245481,370
2024 to 20255321,232

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Cheshire West and Chester Local Plan (Part One) Strategic Policies and Cheshire West and Chester Local Plan (Part Two) Land Allocations and Detailed Policies, adopted on 18 July 2019, covering 2010 to 2030. It replaced 5 earlier plans, including the Chester District Local Plan (2006).

Thirty made neighbourhood plans; Christleton and Littleton is going to referendum and Tattenhall's modified plan awaits the council's decision.

The Cheshire West and Chester Local Plan

Being prepared under the plan-making system introduced in 2026, which runs each plan through three gateways in about 30 months.

Now at scoping consultation, step 2 of 9. Adoption expected on 1 December 2028, 2 years and 1 month away.

Gateway 1 was due on 9 November 2026. The council has not yet published it as done; its own page will say whether it happened on time.

  1. Notice of intention12 June 2026
  2. NowScoping consultation7 Sep 2026
  3. Gateway 19 Nov 2026
  4. Content and evidence consultation7 Dec 2026
  5. Gateway 21 Apr 2027
  6. Plan consultation1 Oct 2027
  7. Gateway 31 Mar 2028
  8. Examination1 May 2028
  9. Adoption1 Dec 2028
  1. Notice of intention12 June 2026
  2. Scoping consultationNow7 Sep 2026
  3. Gateway 19 Nov 2026
  4. Content and evidence consultation7 Dec 2026
  5. Gateway 21 Apr 2027
  6. Plan consultation1 Oct 2027
  7. Gateway 31 Mar 2028
  8. Examination1 May 2028
  9. Adoption1 Dec 2028

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-11-12 (7 days ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 938 appeals against Cheshire West and Chester's decisions and allowed 290 of them (31%), against 31% across all councils. For major schemes, 17 of 28 were allowed (61%, against 50% across all councils).

YearDecidedAllowedShare allowed
20199327 (29%)
20209224 (26%)
20216919 (28%)
20229935 (35%)
20239332 (34%)
202410036 (36%)
202511137 (33%)
20265711 (19%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Cheshire West and Chester's own pages

Land supply around Cheshire West and Chester

Amber Valley: 5.8 yearsAshfield: 3.86 yearsBarnsley: 2.9 yearsBassetlaw: 5.31 yearsBirmingham: 6.45 yearsBlaby: 2.78 yearsBlackburn with Darwen: 5.7 yearsBlackpool: 2.1 yearsBolsover: 4.82 yearsBolton: 3.61 yearsBradford: 3.59 yearsBromsgrove: 2.24 yearsBroxtowe: No current figure publishedBurnley: 12.3 yearsBury: 4.3 yearsCalderdale: 3.89 yearsCannock Chase: 5 yearsCharnwood: 3.56 yearsCheshire East: 3.3 yearsCheshire West and Chester: 1.6 yearsChesterfield: 3.46 yearsChorley: 3.4 yearsCoventry: No current figure publishedDerby: 2.39 yearsDerbyshire Dales: No current figure publishedDoncaster: 6.35 yearsDudley: No current figure publishedEast Riding of Yorkshire: No current figure publishedEast Staffordshire: 5.06 yearsErewash: 1.6 yearsFylde: 4.35 yearsGedling: 3.73 yearsHalton: No current figure publishedHarborough: 3.1 yearsHigh Peak: 2.47 yearsHinckley and Bosworth: 4.47 yearsHyndburn: 5.91 yearsKirklees: 4.18 yearsKnowsley: 4.68 yearsLancaster: 2 yearsLeeds: 6.4 yearsLeicester: No current figure publishedLichfield: 3.5 yearsLiverpool: 5.64 yearsManchester: No current figure publishedMansfield: 5.53 yearsMelton: 7.6 yearsNewark and Sherwood: 4.02 yearsNewcastle-under-Lyme: No current figure publishedNorth East Derbyshire: 4.47 yearsNorth Warwickshire: 1.5 yearsNorth West Leicestershire: 5.1 yearsNorth Yorkshire: 2.26 yearsNottingham: 6.57 yearsNuneaton and Bedworth: 10.2 yearsOadby and Wigston: 6.68 yearsOldham: 6.7 yearsPendle: 5.32 yearsPreston: 5.48 yearsRibble Valley: 2.24 yearsRochdale: 5.2 yearsRossendale: 5.3 yearsRotherham: 4.4 yearsRugby: 3.4 yearsRushcliffe: 5.1 yearsSalford: 7.1 yearsSandwell: 1.86 yearsSefton: 3.34 yearsSheffield: No current figure publishedShropshire: 4.61 yearsSolihull: No current figure publishedSouth Derbyshire: 5.27 yearsSouth Ribble: 5.53 yearsSouth Staffordshire: 0.87 yearsSt Helens: 6.07 yearsStafford: No current figure publishedStaffordshire Moorlands: 2.95 yearsStockport: 1.77 yearsStoke-on-Trent: 3.73 yearsTameside: 5.35 yearsTamworth: 1.6 yearsTelford and Wrekin: 6.02 yearsTrafford: 6.6 yearsWakefield: 5.5 yearsWalsall: 2 yearsWarrington: 5.14 yearsWest Lancashire: 2.49 yearsWest Northamptonshire: No current figure publishedWigan: 5.45 yearsWirral: 6.63 yearsWolverhampton: Says it cannot show five yearsWyre: 8.36 yearsWyre Forest: 8.8 yearsYork: No current figure published
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Cheshire West and Chester

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Cheshire West and Chester from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.