Tameside: housing land supply, local plan and appeals

Tameside Council says it can show a 5.35-year supply of housing land, at 1 April 2025, measured against Places for Everyone policy JP-H1 requirement (2,425 homes for 2025-2030, 2,546 with the 5% buffer).

The two most recent appeal decisions that dealt with land supply, from 20 January 2026 to 1 April 2026, both found the council could show five years. Before that, inspectors found it could not, most recently on 14 October 2024.

It scored 232% in the 2025 Housing Delivery Test, with no consequence listed.

Its local plan, the Places for Everyone Joint Development Plan Document, was adopted on 21 March 2024. A replacement, the Homes, Spaces, Places, is at Regulation 19.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Tameside Council's latest published position is a 5.35-year supply of deliverable housing land for the period 2025/26 to 2029/30, made up of 2,725 homes it expects on deliverable sites. It is measured against Places for Everyone policy JP-H1 requirement (2,425 homes for 2025-2030, 2,546 with the 5% buffer).

This is the latest figure the council has published. Its base date is 1 April 2025, more than 18 months ago.

Other councils in the North West

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published December 2025. Checked 2026-10-02 (7 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Tameside where the inspector dealt with land supply, and what each one found.

  1. Five years shownNot disputed1 April 2026 - appeal dismissed
    Junction Inn, Mossley Road, Ashton-under-lyne
    “I note that the Council can demonstrate a five-year housing land supply”
  2. Five years shownNot disputed20 January 2026 - appeal dismissed
    3 Walkers Fold, Mossley, ASHTON-UNDER-LYNE
    “The evidence indicates that the Council can demonstrate a five-year housing land supply.”
  3. Five years not shownNot disputed14 October 2024 - appeal dismissed
    Land On The Junction Of Astley Street And Smith Street, Smith Street, Tameside
    “The Council cannot currently demonstrate a 5 year housing land supply and consequently the provisions of paragraph 11 of the Framework apply.”
  4. Five years not shownNot disputed15 May 2024 - appeal dismissed
    298 Mossley Road, ASHTON-UNDER-LYNE, Tameside
    “Both main parties agree that the Council is unable to demonstrate a five-year housing land supply. Paragraph 11(d) of the Framework therefore applies.”
  5. Five years not shownNot disputed23 January 2024 - appeal dismissed
    184 Dowson Road, HYDE
    “The Council have confirmed that it is currently unable to demonstrate a 5-year supply of deliverable housing sites.”
  6. Five years not shownNot disputed18 December 2023 - appeal dismissed
    154, ST MARYS ROAD, HYDE
    “The Council accepts that it cannot demonstrate a five-year supply of deliverable housing sites and so paragraph 11d of the Framework is engaged.”
  7. Five years not shownNot disputed31 August 2023 - appeal dismissed
    Land adjacent to Tobits, Mount Road, Werneth Low, Hyde
    “The main parties agree that the local planning authority cannot demonstrate a five-year supply of deliverable housing sites. On that basis, the tilted balance should be engaged”

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Tameside scored 232% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: None.

YearHomes neededHomes delivered
2022 to 2023236467
2023 to 2024236632
2024 to 2025236544

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Places for Everyone Joint Development Plan Document, Tameside Unitary Development Plan (saved policies), Greater Manchester Joint Waste Development Plan Document and Greater Manchester Joint Minerals Development Plan Document, adopted on 21 March 2024, covering 2022 to 2039.

No made neighbourhood plans. Two designated areas: Mossley (2022) and Denton South (2017).

The Homes, Spaces, Places

Being prepared under the plan-making system in place before 2026.

Now at regulation 19 consultation, step 3 of 7. Adoption expected: autumn 2027.

  1. Early preparation8 July 2024
  2. Regulation 18 consultation
  3. NowRegulation 19 consultation1 Oct 2026
  4. SubmittedDec 2026
  5. Examination hearingssummer 2027
  6. Main modifications
  7. Adoptionautumn 2027
  1. Early preparation8 July 2024
  2. Regulation 18 consultation
  3. Regulation 19 consultationNow1 Oct 2026
  4. SubmittedDec 2026
  5. Examination hearingssummer 2027
  6. Main modifications
  7. Adoptionautumn 2027

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-10-25 (4 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 275 appeals against Tameside's decisions and allowed 67 of them (24%), against 31% across all councils.

YearDecidedAllowedShare allowed
2019328 (25%)
2020354 (11%)
20213311 (33%)
2022288 (29%)
2023307 (23%)
2024258 (32%)
20253310 (30%)
2026223 (14%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Tameside's own pages

Land supply around Tameside

Barnsley: 2.9 yearsBlackburn with Darwen: 5.7 yearsBolton: 3.61 yearsBury: 4.3 yearsCalderdale: 3.89 yearsCheshire East: 3.3 yearsCheshire West and Chester: 1.6 yearsChorley: 3.4 yearsHigh Peak: 2.47 yearsKirklees: 4.18 yearsManchester: No current figure publishedNorth Yorkshire: 2.26 yearsOldham: 6.7 yearsRochdale: 5.2 yearsRossendale: 5.3 yearsSalford: 7.1 yearsSheffield: No current figure publishedStockport: 1.77 yearsTameside: 5.35 yearsTrafford: 6.6 yearsWakefield: 5.5 yearsWarrington: 5.14 yearsWigan: 5.45 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Tameside

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Tameside from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.