Oldham Council says it can show a 6.7-year supply of housing land, at 1 April 2025, measured against Places for Everyone policy JP-H1 stepped requirement (680 homes a year for 2025-2030; 3,400 homes over the five years).

It scored 115% in the 2025 Housing Delivery Test, with no consequence listed.

Its local plan, the Places for Everyone 2022-2039, was adopted on 21 March 2024. A replacement, the Oldham Local Plan, is at examination.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Oldham Council's latest published position is a 6.7-year supply of deliverable housing land for the period 2025/26 to 2029/30, made up of 4,544 homes it expects on deliverable sites. It is measured against Places for Everyone policy JP-H1 stepped requirement (680 homes a year for 2025-2030; 3,400 homes over the five years).

This is the latest figure the council has published. Its base date is 1 April 2025, more than 18 months ago.

Other councils in the North West

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published January 2026. Checked 2026-11-05 (2 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Oldham where the inspector dealt with land supply, and what each one found.

  1. Five years not shownNot disputed21 August 2023 - appeal dismissed
    Land adjacent to Maltby Court, Lees, Oldham
    “It is common ground that the Council is unable to demonstrate a 5 year housing land supply, with the main parties referencing a 4.4 year supply”
    Figures given: council 4.4 years, appellant 4.4 years. Decision 3311822
  2. Five years not shownDisputed28 February 2023 - appeal dismissed
    Land off Stockport Road, Lydgate, Oldham
    “currently, it is unable to demonstrate a five-year supply of deliverable housing land when considered against the standard methodology”
  3. Inspector did not decideDisputed11 January 2023 - appeal dismissed
    Land to the west of Healds Green, Chadderton, Oldham
    “The appellant has not challenged this figure and I have not been provided with any substantive evidence to do so either.”
    Figures given: council 4.4 years. Decision 3299298

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Oldham scored 115% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: None.

YearHomes neededHomes delivered
2022 to 2023404400
2023 to 2024404417
2024 to 2025404578

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Places for Everyone 2022-2039, Joint Core Strategy and Development Management Policies DPD 2011 (as amended by Places for Everyone), Saved Unitary Development Plan 2006 policies, Greater Manchester Joint Waste DPD 2012 and Greater Manchester Joint Minerals DPD 2013, adopted on 21 March 2024, covering 2022 to 2039.

No made plans; Saddleworth goes to referendum on 10 December 2026 and Chadderton has a designated area and forum.

The Oldham Local Plan

Being prepared under the plan-making system in place before 2026.

Now at examination hearings, step 5 of 7.

  1. Early preparation
  2. Regulation 18 consultation
  3. Regulation 19 consultation4 Feb 2026
  4. Submitted14 Aug 2026
  5. NowExamination hearings8 Dec 2026
  6. Main modifications
  7. Adoption
  1. Early preparation
  2. Regulation 18 consultation
  3. Regulation 19 consultation4 Feb 2026
  4. Submitted14 Aug 2026
  5. Examination hearingsNow8 Dec 2026
  6. Main modifications
  7. Adoption

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-11-05 (2 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 439 appeals against Oldham's decisions and allowed 122 of them (28%), against 31% across all councils. For major schemes, 3 of 6 were allowed (50%, against 50% across all councils).

YearDecidedAllowedShare allowed
2019367 (19%)
20203210 (31%)
20214011 (28%)
20225012 (24%)
2023378 (22%)
20244110 (24%)
20253613 (36%)
2026203 (15%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Oldham's own pages

Land supply around Oldham

Barnsley: 2.9 yearsBlackburn with Darwen: 5.7 yearsBolton: 3.61 yearsBradford: 3.59 yearsBurnley: 12.3 yearsBury: 4.3 yearsCalderdale: 3.89 yearsCheshire East: 3.3 yearsChorley: 3.4 yearsHigh Peak: 2.47 yearsHyndburn: 5.91 yearsKirklees: 4.18 yearsLeeds: 6.4 yearsManchester: No current figure publishedNorth Yorkshire: 2.26 yearsOldham: 6.7 yearsRibble Valley: 2.24 yearsRochdale: 5.2 yearsRossendale: 5.3 yearsSalford: 7.1 yearsSheffield: No current figure publishedSouth Ribble: 5.53 yearsStockport: 1.77 yearsTameside: 5.35 yearsTrafford: 6.6 yearsWakefield: 5.5 yearsWarrington: 5.14 yearsWigan: 5.45 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Oldham

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Oldham from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.