Wyre: housing land supply, local plan and appeals

Wyre Council says it can show a 8.36-year supply of housing land, at 1 April 2026, measured against Wyre Local Plan (2011-2031) (incorporating partial update of 2022), standard method.

The most recent appeal decision that dealt with land supply, on 26 February 2025, found the council could show five years.

It scored 237% in the 2025 Housing Delivery Test, with no consequence listed.

Its local plan, the Wyre Local Plan 2011-2031 (incorporating partial update of 2022), was adopted on 26 January 2023.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Wyre Council's latest published position is a 8.36-year supply of deliverable housing land for the period 2026/27 to 2030/31, made up of 2,968 homes it expects on deliverable sites. It is measured against Wyre Local Plan (2011-2031) (incorporating partial update of 2022), standard method.

Other councils in the North West

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published 2026-08. Checked 2026-10-02 (7 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Wyre where the inspector dealt with land supply, and what each one found.

  1. Five years shownDisputed26 February 2025 - appeal dismissed
    Stables at Woodville, Myerscough Hall Drive, Bilsborrow, Lancashire
    “there is no substantive evidence before me that indicates that the Council is unable to demonstrate a five year supply of housing”

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Wyre scored 237% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: None.

YearHomes neededHomes delivered
2022 to 2023297721
2023 to 2024282676
2024 to 2025280638

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Wyre Local Plan 2011-2031 (incorporating partial update of 2022) and Lancashire Minerals and Waste Local Plan (county), adopted on 26 January 2023, covering 2011 to 2031. It replaced the Wyre Local Plan (2011-2031) [original, 28 February 2019].

One made neighbourhood plan (Barton, a joint area with Preston, adopted 2023); three more designated areas in preparation (Dolphinholme, Garstang, Inskip).

Source: the council's local plan pages. Checked 2026-09-30 (7 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 224 appeals against Wyre's decisions and allowed 65 of them (29%), against 31% across all councils. For major schemes, 11 of 20 were allowed (55%, against 50% across all councils).

YearDecidedAllowedShare allowed
2019253 (12%)
2020194 (21%)
2021152 (13%)
2022339 (27%)
2023207 (35%)
2024226 (27%)
2025142 (14%)
2026186 (33%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Wyre's own pages

Land supply around Wyre

Blackburn with Darwen: 5.7 yearsBlackpool: 2.1 yearsBolton: 3.61 yearsBradford: 3.59 yearsBurnley: 12.3 yearsBury: 4.3 yearsCalderdale: 3.89 yearsChorley: 3.4 yearsCumberland: 2.5 yearsFylde: 4.35 yearsHigh Peak: 2.47 yearsHyndburn: 5.91 yearsKirklees: 4.18 yearsKnowsley: 4.68 yearsLancaster: 2 yearsLiverpool: 5.64 yearsManchester: No current figure publishedNorth Yorkshire: 2.26 yearsOldham: 6.7 yearsPendle: 5.32 yearsPreston: 5.48 yearsRibble Valley: 2.24 yearsRochdale: 5.2 yearsRossendale: 5.3 yearsSalford: 7.1 yearsSefton: 3.34 yearsSouth Ribble: 5.53 yearsSt Helens: 6.07 yearsTameside: 5.35 yearsTrafford: 6.6 yearsWarrington: 5.14 yearsWest Lancashire: 2.49 yearsWestmorland and Furness: 3.17 yearsWigan: 5.45 yearsWyre: 8.36 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Wyre

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Wyre from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.