Warrington Council says it can show a 5.14-year supply of housing land, at 1 April 2025, measured against Local Plan Policy DEV1 stepped requirement (678 homes a year to 2025/26, then 870 a year), plus 5% buffer: 4,366 over five years.

It scored 134% in the 2025 Housing Delivery Test, with no consequence listed.

Its local plan, the Warrington Local Plan 2021/22-2038/39, was adopted on 4 December 2023. A replacement, the The Warrington Local Plan, is at Gateway 1, with adoption expected on 5 March 2029.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Warrington Council's latest published position is a 5.14-year supply of deliverable housing land for the period 2025/26 to 2029/30, made up of 4,489 homes it expects on deliverable sites. It is measured against Local Plan Policy DEV1 stepped requirement (678 homes a year to 2025/26, then 870 a year), plus 5% buffer: 4,366 over five years.

This is the latest figure the council has published. Its base date is 1 April 2025, more than 18 months ago.

Other councils in the North West

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published 2025-12. Checked 2026-10-26 (3 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Warrington where the inspector dealt with land supply, and what each one found.

  1. Five years not shownNot disputed1 November 2024 - appeal dismissed
    76 Ackers Road, Stockton Heath, WARRINGTON
    “The Council is not able to demonstrate the supply of housing sites required by the National Planning Policy Framework 2023”
  2. Five years not shownNot disputed19 February 2024 - appeal dismissed
    Land adjacent to 137 Kingsway North, Warrington, Cheshire
    “The Council confirms that it has a 3.54 year supply of housing land and therefore cannot demonstrate a 5-year supply.”
    Figures given: council 3.54 years. Decision 3319586
  3. Five years not shownNot disputed13 July 2023 - appeal dismissed
    Cuerdon Cottage, Cuerdon Drive, Grappenhall and Thelwall, Warrington, Cheshire
    “The Council does not presently have a 5-year land supply. I am not advised of the shortfall, however, given the scale of the development, I give this benefit only limited weight.”
  4. Five years not shownNot disputed12 January 2023 - appeal dismissed
    43 Lovely Lane, WARRINGTON
    “The Council has advised that it cannot currently demonstrate a five year housing land supply”

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Warrington scored 134% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: None.

YearHomes neededHomes delivered
2022 to 20236791,473
2023 to 2024679673
2024 to 2025679589

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Warrington Local Plan 2021/22-2038/39, adopted on 4 December 2023, covering 2021 to 2039. It replaced the Warrington Local Plan Core Strategy.

One made neighbourhood plan (Appleton Thorn, 2017); Grappenhall and Thelwall and Lymm are submitted and heading to examination.

The The Warrington Local Plan

Being prepared under the plan-making system introduced in 2026, which runs each plan through three gateways in about 30 months.

Now at gateway 1, step 3 of 9. Adoption expected on 5 March 2029, 2 years and 4 months away.

Content and evidence consultation was due on 17 November 2026. The council has not yet published it as done; its own page will say whether it happened on time.

  1. Notice of intention16 Apr 2026
  2. Scoping consultation16 Apr 2026
  3. NowGateway 121 Sep 2026
  4. Content and evidence consultation17 Nov 2026
  5. Gateway 21 June 2027
  6. Plan consultation19 Oct 2027
  7. Gateway 31 June 2028
  8. Examination3 July 2028
  9. Adoption5 Mar 2029
  1. Notice of intention16 Apr 2026
  2. Scoping consultation16 Apr 2026
  3. Gateway 1Now21 Sep 2026
  4. Content and evidence consultation17 Nov 2026
  5. Gateway 21 June 2027
  6. Plan consultation19 Oct 2027
  7. Gateway 31 June 2028
  8. Examination3 July 2028
  9. Adoption5 Mar 2029

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-10-26 (3 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 463 appeals against Warrington's decisions and allowed 170 of them (37%), against 31% across all councils. For major schemes, 6 of 10 were allowed (60%, against 50% across all councils).

YearDecidedAllowedShare allowed
20194214 (33%)
20204218 (43%)
20212811 (39%)
20225618 (32%)
2023288 (29%)
20244715 (32%)
20256827 (40%)
20263313 (39%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Warrington's own pages

Land supply around Warrington

Blackburn with Darwen: 5.7 yearsBolton: 3.61 yearsBury: 4.3 yearsCalderdale: 3.89 yearsCheshire East: 3.3 yearsCheshire West and Chester: 1.6 yearsChorley: 3.4 yearsHalton: No current figure publishedHigh Peak: 2.47 yearsKirklees: 4.18 yearsKnowsley: 4.68 yearsLiverpool: 5.64 yearsManchester: No current figure publishedNorth Yorkshire: 2.26 yearsOldham: 6.7 yearsRochdale: 5.2 yearsRossendale: 5.3 yearsSalford: 7.1 yearsSefton: 3.34 yearsSt Helens: 6.07 yearsStaffordshire Moorlands: 2.95 yearsStockport: 1.77 yearsTameside: 5.35 yearsTrafford: 6.6 yearsWarrington: 5.14 yearsWest Lancashire: 2.49 yearsWigan: 5.45 yearsWirral: 6.63 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Warrington

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Warrington from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.