Nuneaton and Bedworth: housing land supply, local plan and appeals

Nuneaton and Bedworth Council says it can show a 10.2-year supply of housing land, at 1 April 2026, measured against Borough Plan Review (2021-2039) requirement of 9,810 homes (545 a year), with 1,766 homes of past over-supply netted off (reverse Liverpool method).

The most recent appeal decision that dealt with land supply, on 4 March 2026, found the council could show five years. Before that, inspectors found it could not, most recently on 18 September 2024.

It scored 221% in the 2025 Housing Delivery Test, with no consequence listed.

Its local plan, the Borough Plan Review (2021-2039), was adopted on 10 December 2025. A replacement, the Nuneaton and Bedworth Borough Local Plan, is at Gateway 1, with adoption expected on 30 April 2029.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Nuneaton and Bedworth Council's latest published position is a 10.2-year supply of deliverable housing land for the period 1 April 2026 to 31 March 2031, made up of 5,036 homes it expects on deliverable sites. It is measured against Borough Plan Review (2021-2039) requirement of 9,810 homes (545 a year), with 1,766 homes of past over-supply netted off (reverse Liverpool method).

Other councils in the West Midlands

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement. Checked 2026-11-02 (2 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Nuneaton and Bedworth where the inspector dealt with land supply, and what each one found.

  1. Five years shownNot disputed4 March 2026 - appeal dismissed
    256 The Long Shoot, Nuneaton
    “as of 1 April 2025 it is able to demonstrate a 10.5-year supply.”
    Figures given: council 10.5 years. Decision 6001684
  2. Five years not shownDisputed18 September 2024 - appeal dismissed
    Land South of the Long Shoot, Nuneaton
    “I therefore take supply to be within the range found at those more recent inquiries, that being between 2.74 and 3.4 years.”
    Figures given: council 4.06 years, appellant 2.87 years. Decision 3327049
  3. Five years not shownDisputed26 July 2024 - appeal dismissed
    Weddington Road, Nuneaton Weddington
    “I find the current position at the time of my decision to be more in line with the appellant's assessment of 2.74 years.”
    Figures given: council 4.06 years, appellant 2.74 years, inspector 2.74 years. Decision 3330615
  4. Five years not shownDisputed3 February 2023 - appeal dismissed
    Land opposite, 145 Watling Street, Nuneaton
    “I agree with the Galley Common appeal Inspector's conclusion that the Council is unable to demonstrate a 5 year supply of deliverable housing sites.”
    Figures given: council 5.36 years. Decision 3308944

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Nuneaton and Bedworth scored 221% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: None.

YearHomes neededHomes delivered
2022 to 20234351,006
2023 to 20244421,016
2024 to 2025421844

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Borough Plan Review (2021-2039), Gypsy and Traveller Site Allocations Development Plan Document (2024), Warwickshire Minerals Local Plan (2022) and Warwickshire Waste Core Strategy (2013), adopted on 10 December 2025, covering 2021 to 2039. It replaced the Borough Plan (2011-2031).

No neighbourhood plans, areas or forums in the borough.

The Nuneaton and Bedworth Borough Local Plan

Being prepared under the plan-making system introduced in 2026, which runs each plan through three gateways in about 30 months.

Now at gateway 1, step 3 of 9. Adoption expected on 30 April 2029, 2 years and 5 months away.

  1. Notice of intention29 June 2026
  2. Scoping consultation29 June 2026
  3. NowGateway 130 Oct 2026
  4. Content and evidence consultation28 June 2027
  5. Gateway 229 Nov 2027
  6. Plan consultation3 Apr 2028
  7. Gateway 34 Sep 2028
  8. Examination30 Oct 2028
  9. Adoption30 Apr 2029
  1. Notice of intention29 June 2026
  2. Scoping consultation29 June 2026
  3. Gateway 1Now30 Oct 2026
  4. Content and evidence consultation28 June 2027
  5. Gateway 229 Nov 2027
  6. Plan consultation3 Apr 2028
  7. Gateway 34 Sep 2028
  8. Examination30 Oct 2028
  9. Adoption30 Apr 2029

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-11-02 (2 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 147 appeals against Nuneaton and Bedworth's decisions and allowed 62 of them (42%), against 31% across all councils. For major schemes, 4 of 10 were allowed (40%, against 50% across all councils).

YearDecidedAllowedShare allowed
2019116 (55%)
2020145 (36%)
2021186 (33%)
2022104 (40%)
2023167 (44%)
2024194 (21%)
202595 (56%)
202641 (25%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Nuneaton and Bedworth's own pages

Land supply around Nuneaton and Bedworth

Birmingham: 6.45 yearsBlaby: 2.78 yearsBromsgrove: 2.24 yearsCharnwood: 3.56 yearsCoventry: No current figure publishedHarborough: 3.1 yearsHinckley and Bosworth: 4.47 yearsLeicester: No current figure publishedLichfield: 3.5 yearsNorth Warwickshire: 1.5 yearsNuneaton and Bedworth: 10.2 yearsOadby and Wigston: 6.68 yearsRugby: 3.4 yearsSolihull: No current figure publishedStratford-on-Avon: 2.43 yearsTamworth: 1.6 yearsWarwick: No current figure publishedWest Northamptonshire: No current figure publishedWychavon: 5.48 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Nuneaton and Bedworth

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Nuneaton and Bedworth from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.