Tamworth: housing land supply, local plan and appeals

Tamworth Council says it can show a 1.6-year supply of housing land, at 1 April 2025, short of the five years national policy asks for.

The most recent appeal decision that dealt with land supply, on 19 October 2026, found the council could not show five years.

It scored 220% in the 2025 Housing Delivery Test, with no consequence listed.

Its local plan, the Tamworth Local Plan 2006-2031 (adopted 23 February 2016), was adopted on 23 February 2016. A replacement, the Tamworth Local Plan 2022-2043, is at Regulation 19, with adoption expected in April 2028.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Tamworth Council's latest published position is a 1.6-year supply of deliverable housing land.

This is the latest figure the council has published. Its base date is 1 April 2025, more than 18 months ago.

Other councils in the West Midlands

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement. Checked 2026-10-02 (7 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Tamworth where the inspector dealt with land supply, and what each one found.

  1. Five years not shownNot disputed19 October 2026 - appeal dismissed
    20 Warwick Road, Glascote, Tamworth
    “Given the acute shortfall in housing land supply, in accordance with Policy H07 and L2 of the Framework, I attach substantial weight to the benefit of boosting housing supply”

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Tamworth scored 220% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: None.

YearHomes neededHomes delivered
2022 to 2023141358
2023 to 2024127279
2024 to 2025123224

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Tamworth Local Plan 2006-2031 (adopted 23 February 2016), Tamworth Local Plan 2001-2011 saved policy EMP7 (Working from Home), Minerals Local Plan for Staffordshire 2015-2030 (adopted February 2017) and Joint Waste Local Plan for Staffordshire and Stoke-on-Trent 2010-2026 (adopted March 2013), adopted on 23 February 2016, covering 2006 to 2031. It replaced the Tamworth Local Plan 2001-2011 (all but EMP7).

The Tamworth Local Plan 2022-2043

Being prepared under the plan-making system in place before 2026.

Now at regulation 19 consultation, step 3 of 7. Adoption expected in April 2028, 1 year and 5 months away.

  1. Early preparation
  2. Regulation 18 consultation2022
  3. NowRegulation 19 consultation24 Aug 2026
  4. SubmittedDec 2026
  5. Examination hearings
  6. Main modifications
  7. AdoptionApr 2028
  1. Early preparation
  2. Regulation 18 consultation2022
  3. Regulation 19 consultationNow24 Aug 2026
  4. SubmittedDec 2026
  5. Examination hearings
  6. Main modifications
  7. AdoptionApr 2028

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-09-29 (7 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 62 appeals against Tamworth's decisions and allowed 14 of them (23%), against 31% across all councils.

YearDecidedAllowedShare allowed
201993 (33%)
202040 (0%)
202191 (11%)
202250 (0%)
202362 (33%)
202452 (40%)
202520 (0%)
202631 (33%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Tamworth's own pages

Land supply around Tamworth

Birmingham: 6.45 yearsCannock Chase: 5 yearsEast Staffordshire: 5.06 yearsHinckley and Bosworth: 4.47 yearsLichfield: 3.5 yearsNorth Warwickshire: 1.5 yearsNorth West Leicestershire: 5.1 yearsNuneaton and Bedworth: 10.2 yearsRugby: 3.4 yearsSandwell: 1.86 yearsSouth Derbyshire: 5.27 yearsTamworth: 1.6 yearsWalsall: 2 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Tamworth

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Tamworth from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.