Mansfield: housing land supply, local plan and appeals

Mansfield Council says it can show a 5.53-year supply of housing land, at 1 April 2026, measured against local housing need (standard method), because the adopted 2020 Local Plan is more than five years old.

The most recent appeal decision that dealt with land supply, on 16 November 2026, found the council could show five years.

It scored 134% in the 2025 Housing Delivery Test, with no consequence listed.

Its local plan, the Mansfield District Local Plan 2013-2033, was adopted on 8 September 2020. A replacement, the Mansfield Local Plan Review 2023-2043, is at Regulation 19, with adoption expected in December 2027.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Mansfield Council's latest published position is a 5.53-year supply of deliverable housing land for the period 1 April 2026 to 31 March 2031, made up of 2,853 homes it expects on deliverable sites. It is measured against local housing need (standard method), because the adopted 2020 Local Plan is more than five years old.

Other councils in the East Midlands

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published October 2026. Checked 2026-10-28 (3 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Mansfield where the inspector dealt with land supply, and what each one found.

  1. Five years shownDisputed16 November 2026 - appeal dismissed
    Land off the A60 (Church Road), Church Warsop
    “Even applying the higher annual requirement associated with the emerging Local Plan the level of supply would exceed six years.”
    Figures given: council 6.59 years. Decision 6013675

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Mansfield scored 134% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: None.

YearHomes neededHomes delivered
2022 to 2023272380
2023 to 2024264390
2024 to 2025259297

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Mansfield District Local Plan 2013-2033, Nottinghamshire and Nottingham Joint Waste Local Plan (adopted 18 September 2025) and Nottinghamshire Minerals Local Plan (adopted 25 March 2021), adopted on 8 September 2020, covering 2013 to 2033. It replaced the Mansfield District Local Plan 1998.

No made neighbourhood plans; Warsop has a designated area and a draft plan in preparation.

The Mansfield Local Plan Review 2023-2043

Being prepared under the plan-making system in place before 2026.

Now at regulation 19 consultation, step 3 of 7. Adoption expected in December 2027, 1 year and 1 month away.

  1. Early preparation
  2. Regulation 18 consultation30 May 2025
  3. NowRegulation 19 consultation29 Sep 2026
  4. SubmittedDec 2026
  5. Examination hearingsJan 2027
  6. Main modifications
  7. AdoptionDec 2027
  1. Early preparation
  2. Regulation 18 consultation30 May 2025
  3. Regulation 19 consultationNow29 Sep 2026
  4. SubmittedDec 2026
  5. Examination hearingsJan 2027
  6. Main modifications
  7. AdoptionDec 2027

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-10-28 (3 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 100 appeals against Mansfield's decisions and allowed 28 of them (28%), against 31% across all councils. For major schemes, 4 of 7 were allowed (57%, against 50% across all councils).

YearDecidedAllowedShare allowed
2019184 (22%)
2020102 (20%)
202175 (71%)
202291 (11%)
2023122 (17%)
202462 (33%)
202550 (0%)
202652 (40%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Mansfield's own pages

Land supply around Mansfield

Amber Valley: 5.8 yearsAshfield: 3.86 yearsBassetlaw: 5.31 yearsBolsover: 4.82 yearsBroxtowe: No current figure publishedChesterfield: 3.46 yearsDerbyshire Dales: No current figure publishedEast Staffordshire: 5.06 yearsErewash: 1.6 yearsGedling: 3.73 yearsMansfield: 5.53 yearsNewark and Sherwood: 4.02 yearsNorth East Derbyshire: 4.47 yearsNorth Kesteven: 7.1 yearsNottingham: 6.57 yearsRotherham: 4.4 yearsRushcliffe: 5.1 yearsSheffield: No current figure publishedSouth Kesteven: 4.07 yearsWest Lindsey: 7.1 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Mansfield

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Mansfield from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.