Melton Council says it can show a 7.6-year supply of housing land, at 1 April 2026, measured against Adopted Local Plan stepped requirement (320 dwellings a year 2026-2036), shortfall spread by the Liverpool method, 5.79% lapse rate on permissions.
The four most recent appeal decisions that dealt with land supply, from 22 June 2023 to 24 September 2026, all found the council could show five years.
It scored 190% in the 2025 Housing Delivery Test, with no consequence listed.
Its local plan, the Melton Local Plan 2011-2036, was adopted on 10 October 2018. A replacement, the Melton Local Plan Partial Update to 2036, is at main modifications, with adoption expected in July 2027.
Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.