West Lindsey: housing land supply, local plan and appeals

West Lindsey Council says it can show a 7.1-year supply of housing land, at 1 April 2025, measured against Local plan requirement (the plan was adopted in April 2023, under five years ago).

The most recent appeal decision that dealt with land supply, on 14 July 2025, found the council could show five years.

It scored 141% in the 2025 Housing Delivery Test, with no consequence listed.

Its local plan, the Central Lincolnshire Local Plan (2023), was adopted on 13 April 2023. A replacement, the Central Lincolnshire Local Plan Review, is at the scoping consultation, with adoption expected on 1 September 2029.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

West Lindsey Council's latest published position is a 7.1-year supply of deliverable housing land for the period 2025 to 2030, made up of 8,235 homes it expects on deliverable sites. It is measured against Local plan requirement (the plan was adopted in April 2023, under five years ago).

This is the latest figure the council has published. Its base date is 1 April 2025, more than 18 months ago.

Other councils in the East Midlands

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published 2025-10. Checked 2026-10-29 (3 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in West Lindsey where the inspector dealt with land supply, and what each one found.

  1. Five years shownNot disputed14 July 2025 - appeal dismissed
    Land off Mill Lane, Keelby, Grimsby
    “I am mindful there is nothing before me which demonstrates that the Council's housing land supply position cannot be met or that Paragraph 11(d) of the Framework is engaged”
    Figures given: council 7.45 years. Decision 3355400

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. West Lindsey scored 141% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: None.

YearHomes neededHomes delivered
2022 to 20231,1021,716
2023 to 20241,0631,482
2024 to 20251,0541,347

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Central Lincolnshire Local Plan (2023), adopted on 13 April 2023, covering 2018 to 2040. It replaced the Central Lincolnshire Local Plan (2017).

26 made neighbourhood plans across the district, with more at referendum, examination or review stage.

The Central Lincolnshire Local Plan Review

Being prepared under the plan-making system introduced in 2026, which runs each plan through three gateways in about 30 months.

Now at scoping consultation, step 2 of 9. Adoption expected on 1 September 2029, 2 years and 10 months away.

  1. Notice of intention12 Oct 2026
  2. NowScoping consultation22 Oct 2026
  3. Gateway 11 Mar 2027
  4. Content and evidence consultation
  5. Gateway 2
  6. Plan consultation
  7. Gateway 3
  8. Examination1 Dec 2028
  9. Adoption1 Sep 2029
  1. Notice of intention12 Oct 2026
  2. Scoping consultationNow22 Oct 2026
  3. Gateway 11 Mar 2027
  4. Content and evidence consultation
  5. Gateway 2
  6. Plan consultation
  7. Gateway 3
  8. Examination1 Dec 2028
  9. Adoption1 Sep 2029

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-10-28 (3 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 328 appeals against West Lindsey's decisions and allowed 73 of them (22%), against 31% across all councils. For major schemes, 7 of 25 were allowed (28%, against 50% across all councils).

YearDecidedAllowedShare allowed
2019319 (29%)
2020294 (14%)
2021254 (16%)
2022338 (24%)
20231810 (56%)
2024283 (11%)
2025142 (14%)
202692 (22%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

West Lindsey's own pages

Land supply around West Lindsey

Amber Valley: 5.8 yearsAshfield: 3.86 yearsBarnsley: 2.9 yearsBassetlaw: 5.31 yearsBolsover: 4.82 yearsBoston: 4.8 yearsBradford: 3.59 yearsBreckland: 2.88 yearsBroadland: 4.37 yearsBroxtowe: No current figure publishedCalderdale: 3.89 yearsCannock Chase: 5 yearsCharnwood: 3.56 yearsCheshire East: 3.3 yearsChesterfield: 3.46 yearsDerby: 2.39 yearsDerbyshire Dales: No current figure publishedDoncaster: 6.35 yearsEast Lindsey: 2.33 yearsEast Riding of Yorkshire: No current figure publishedEast Staffordshire: 5.06 yearsErewash: 1.6 yearsFenland: 6.6 yearsGedling: 3.73 yearsHigh Peak: 2.47 yearsHinckley and Bosworth: 4.47 yearsKing's Lynn and West Norfolk: 6.2 yearsKingston upon Hull: 3.16 yearsKirklees: 4.18 yearsLeeds: 6.4 yearsLichfield: 3.5 yearsLincoln: 7.1 yearsMansfield: 5.53 yearsMelton: 7.6 yearsNewark and Sherwood: 4.02 yearsNorth East Derbyshire: 4.47 yearsNorth East Lincolnshire: 3.6 yearsNorth Kesteven: 7.1 yearsNorth Lincolnshire: No current figure publishedNorth Norfolk: 7.3 yearsNorth West Leicestershire: 5.1 yearsNorth Yorkshire: 2.26 yearsNottingham: 6.57 yearsOldham: 6.7 yearsPendle: 5.32 yearsRochdale: 5.2 yearsRotherham: 4.4 yearsRushcliffe: 5.1 yearsRutland: 4.34 yearsSheffield: No current figure publishedSouth Derbyshire: 5.27 yearsSouth Holland: 4.6 yearsSouth Kesteven: 4.07 yearsSouth Staffordshire: 0.87 yearsStafford: No current figure publishedStaffordshire Moorlands: 2.95 yearsStockport: 1.77 yearsTameside: 5.35 yearsWakefield: 5.5 yearsWest Lindsey: 7.1 yearsYork: No current figure published
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in West Lindsey

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about West Lindsey from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.