South Holland: housing land supply, local plan and appeals

South Holland Council says it can show a 4.6-year supply of housing land, at 31 March 2026, measured against local housing need (standard method), because the 2019 Local Plan is more than five years old, short of the five years national policy asks for.

The six most recent appeal decisions that dealt with land supply, from 27 October 2023 to 6 November 2025, all found the council could show five years.

It scored 161% in the 2025 Housing Delivery Test, with no consequence listed.

Its local plan, the South East Lincolnshire Local Plan 2011-2036 (adopted 8 March 2019), was adopted on 8 March 2019.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

South Holland Council's latest published position is a 4.6-year supply of deliverable housing land for the period 2026/27 to 2030/31, made up of 2,754 homes it expects on deliverable sites. It is measured against local housing need (standard method), because the 2019 Local Plan is more than five years old.

Other councils in the East Midlands

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published 2026-09. Checked 2026-11-12 (7 days ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in South Holland where the inspector dealt with land supply, and what each one found.

  1. Five years shownNot disputed6 November 2025 - appeal dismissed
    The Firs, Coronation Avenue, Throckenholt, SPALDING
    “The Council are able to demonstrate a five-year supply of deliverable housing sites. The evidence indicates that a supply of 5.5 years is available.”
    Figures given: council 5.5 years, inspector 5.5 years. Decision 3371740
  2. Five years shownNot disputed15 September 2025 - appeal dismissed
    Land off Damgate, Holbeach
    “the Council can demonstrate 6.4 years supply of deliverable housing land”
    Figures given: council 6.4 years, inspector 6.4 years. Decision 3362446
  3. Five years shownDisputed28 July 2025 - appeal dismissed
    Blue Bell Inn, Main Road, Hop Pole, SPALDING
    “there is no evidence to suggest that the Council cannot meet its housing targets”
    Figures given: council 6.4 years. Decision 3361876
  4. Five years shownNot disputed13 November 2024 - appeal dismissed
    Tysdale Bungalow, Common Way, Wisbech
    “The Council has confirmed that it is able to demonstrate a 5-year supply of deliverable housing land and this has not been disputed by the appellant.”
    Figures given: council 5 years. Decision 3343297
  5. Five years shownNot disputed31 July 2024 - appeal dismissed
    Worlds End Road, Tydd St Mary, Wisbech
    “The Council has confirmed that it is able to demonstrate a 5.9 year supply of deliverable housing land and this has not been disputed by the appellant”
    Figures given: council 5.9 years, inspector 5.9 years. Decision 3327835
  6. Five years shownNot disputed27 October 2023 - appeal dismissed
    Fairview Birds Drove, Surfleet, SPALDING
    “The Council can demonstrate a five-year supply of deliverable housing land as required by the National Planning Policy Framework (the Framework)”

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. South Holland scored 161% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: None.

YearHomes neededHomes delivered
2022 to 2023442763
2023 to 2024430635
2024 to 2025427697

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the South East Lincolnshire Local Plan 2011-2036 (adopted 8 March 2019) and Lincolnshire Minerals and Waste Local Plan (Lincolnshire County Council), adopted on 8 March 2019, covering 2011 to 2036. It replaced 2 earlier plans, including the South Holland Local Plan 2006.

No made neighbourhood plans; Surfleet and Long Sutton are designated neighbourhood areas.

Source: the council's local plan pages. Checked 2026-11-12 (7 days ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 290 appeals against South Holland's decisions and allowed 75 of them (26%), against 31% across all councils. For major schemes, 7 of 12 were allowed (58%, against 50% across all councils).

YearDecidedAllowedShare allowed
2019356 (17%)
2020164 (25%)
2021257 (28%)
2022145 (36%)
2023287 (25%)
2024235 (22%)
2025276 (22%)
20263010 (33%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

South Holland's own pages

Land supply around South Holland

Amber Valley: 5.8 yearsAshfield: 3.86 yearsBassetlaw: 5.31 yearsBedford: 3.35 yearsBlaby: 2.78 yearsBolsover: 4.82 yearsBoston: 4.8 yearsBreckland: 2.88 yearsBroadland: 4.37 yearsBroxtowe: No current figure publishedCharnwood: 3.56 yearsChesterfield: 3.46 yearsEast Cambridgeshire: 6.02 yearsEast Lindsey: 2.33 yearsEast Suffolk: 3.07 yearsErewash: 1.6 yearsFenland: 6.6 yearsGedling: 3.73 yearsHarborough: 3.1 yearsHinckley and Bosworth: 4.47 yearsHuntingdonshire: 4.28 yearsKing's Lynn and West Norfolk: 6.2 yearsLeicester: No current figure publishedLincoln: 7.1 yearsMansfield: 5.53 yearsMelton: 7.6 yearsMid Suffolk: 6.73 yearsNewark and Sherwood: 4.02 yearsNorth East Derbyshire: 4.47 yearsNorth Kesteven: 7.1 yearsNorth Norfolk: 7.3 yearsNorth Northamptonshire: 4.35 yearsNorth West Leicestershire: 5.1 yearsNorwich: 4.37 yearsNottingham: 6.57 yearsOadby and Wigston: 6.68 yearsPeterborough: 4.38 yearsRotherham: 4.4 yearsRugby: 3.4 yearsRushcliffe: 5.1 yearsRutland: 4.34 yearsSouth Cambridgeshire: 7.83 yearsSouth Holland: 4.6 yearsSouth Kesteven: 4.07 yearsSouth Norfolk: 4.37 yearsStratford-on-Avon: 2.43 yearsWest Lindsey: 7.1 yearsWest Northamptonshire: No current figure publishedWest Suffolk: 6.02 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in South Holland

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about South Holland from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.