Great Yarmouth Council says it can show a 6.06-year supply of housing land, at 31 March 2026, measured against the Local Plan 2024-2042 housing requirement of 6,840 homes (353 a year 2024/25 to 2027/28, then 380).

It scored 92% in the 2025 Housing Delivery Test, and the government's results list an action plan as the consequence.

Its local plan, the Great Yarmouth Local Plan 2024-2042 (adopted 24 September 2026), was adopted on 24 September 2026. A replacement, the Great Yarmouth Local Plan 2045, is at the scoping consultation.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Great Yarmouth Council's latest published position is a 6.06-year supply of deliverable housing land for the period 2026/27 to 2030/31. It is measured against the Local Plan 2024-2042 housing requirement of 6,840 homes (353 a year 2024/25 to 2027/28, then 380).

The council's separate five-year position statement (published December 2024) shows 5.82 years as at 31 March 2024 against the earlier Core Strategy target, and has not been updated.

Other councils in the East of England

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement. Checked 2026-10-04 (7 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Great Yarmouth where the inspector dealt with land supply, and what each one found.

  1. Five years shownNot disputed30 September 2024 - appeal dismissed
    Rose Farm, Stepshort, Belton, Great Yarmouth, Norfolk
    “the Council can demonstrate a five-year housing land supply and I have little before me to indicate the level of demand for such accommodation in the area.”
  2. Five years shownNot disputed29 January 2024 - appeal dismissed
    Land South of Manor Farm Cottage, Browston Lane, Browston Green, Belton with Browston, Great Yarmouth, Norfolk
    “As the proposal would conflict with policies in an up-to-date development plan, and the Council is able to demonstrate a five-year housing land supply, it does not benefit from the presumption in favour of sustainable development in paragra”

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Great Yarmouth scored 92% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: Action plan.

YearHomes neededHomes delivered
2022 to 2023361332
2023 to 2024359352
2024 to 2025354307

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Great Yarmouth Local Plan 2024-2042 (adopted 24 September 2026), Norfolk County Council Minerals and Waste Local Plan and Six made neighbourhood plans, adopted on 24 September 2026, covering 2024 to 2042. It replaced 2 earlier plans, including the Local Plan Core Strategy (2015).

Six made neighbourhood plans: Rollesby, Filby, Winterton-on-Sea, Fleggburgh, Hemsby, and Belton with Browston, Burgh Castle and Fritton with St Olaves.

The Great Yarmouth Local Plan 2045

Being prepared under the plan-making system introduced in 2026, which runs each plan through three gateways in about 30 months.

Now at scoping consultation, step 2 of 9.

  1. Notice of intention30 June 2026
  2. NowScoping consultation24 Aug 2026
  3. Gateway 1
  4. Content and evidence consultation
  5. Gateway 2
  6. Plan consultation
  7. Gateway 3
  8. Examination
  9. Adoption
  1. Notice of intention30 June 2026
  2. Scoping consultationNow24 Aug 2026
  3. Gateway 1
  4. Content and evidence consultation
  5. Gateway 2
  6. Plan consultation
  7. Gateway 3
  8. Examination
  9. Adoption

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-10-04 (7 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 162 appeals against Great Yarmouth's decisions and allowed 41 of them (25%), against 31% across all councils. For major schemes, 2 of 7 were allowed (29%, against 50% across all councils).

YearDecidedAllowedShare allowed
201981 (13%)
2020152 (13%)
2021274 (15%)
2022103 (30%)
2023124 (33%)
2024224 (18%)
2025184 (22%)
2026136 (46%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Great Yarmouth's own pages

Land supply around Great Yarmouth

Breckland: 2.88 yearsBroadland: 4.37 yearsEast Suffolk: 3.07 yearsGreat Yarmouth: 6.06 yearsMid Suffolk: 6.73 yearsNorth Norfolk: 7.3 yearsNorwich: 4.37 yearsSouth Norfolk: 4.37 yearsWest Suffolk: 6.02 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Great Yarmouth

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Great Yarmouth from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.