Peterborough: housing land supply, local plan and appeals

Peterborough Council says it can show a 4.38-year supply of housing land, at 1 April 2025, measured against local housing need by the standard method (1,030 homes a year), because the 2019 Local Plan is more than five years old, short of the five years national policy asks for.

The four most recent appeal decisions that dealt with land supply, from 25 July 2024 to 12 December 2025, all found the council could not show five years.

It scored 100% in the 2025 Housing Delivery Test, with no consequence listed.

Its local plan, the Peterborough Local Plan (2019), was adopted on 24 July 2019. A replacement, the Peterborough Local Plan 2024-2043, is at Regulation 19, with adoption expected in September 2027.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Peterborough Council's latest published position is a 4.38-year supply of deliverable housing land for the five years from 1 April 2025 to 31 March 2030, made up of 4,739 homes it expects on deliverable sites. It is measured against local housing need by the standard method (1,030 homes a year), because the 2019 Local Plan is more than five years old.

The statement says the council cannot demonstrate a five-year supply. The council's separate plan-level report (September 2026) for the new Local Plan covers a later period (April 2027 to 2032) and is not the decision-taking figure.

This is the latest figure the council has published. Its base date is 1 April 2025, more than 18 months ago.

Other councils in the East of England

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published 2026-03-27. Checked 2026-10-05 (6 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Peterborough where the inspector dealt with land supply, and what each one found.

  1. Five years not shownNot disputed12 December 2025 - appeal dismissed
    Land East of 29 Peakirk Road, Glinton, Peterborough
    “As the Council is unable to demonstrate it has a 5 year supply of deliverable housing land, paragraph 11d) of the Framework is engaged, which is not in dispute”
    Figures given: inspector 4.88 years. Decision 3367425
  2. Five years not shownNot disputed14 July 2025 - appeal allowed
    Land to the East of Lincoln Road, Glinton
    “the provisions of Framework paragraph 11 d) are engaged in this case, owing to the Council's inability to demonstrate a five year supply of housing land”
  3. Five years not shownNot disputed6 November 2024 - appeal dismissed
    Friarfield London Road, STAMFORD, Peterborough, Cambridge
    “The Council has acknowledged that it is not currently able to demonstrate a five-year housing land supply”
  4. Five years not shownNot disputed25 July 2024 - appeal dismissed
    Field To The East Of Old Pump House, Old Leicester Road, Wansford, Peterborough, Cambridgeshire
    “The Council are currently unable to demonstrate a five-year housing land supply and therefore the most important policies in the LP for determining the application”

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Peterborough scored 100% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: None.

YearHomes neededHomes delivered
2022 to 2023950765
2023 to 2024946856
2024 to 20259361,219

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Peterborough Local Plan (2019) and Cambridgeshire and Peterborough Minerals and Waste Local Plan (2021), adopted on 24 July 2019, covering 2016 to 2036.

Seven made neighbourhood plans (Peakirk, Ailsworth, Castor, Barnack, Glinton, Helpston, Werrington); several more parishes are at the neighbourhood area designation stage.

The Peterborough Local Plan 2024-2043

Being prepared under the plan-making system in place before 2026.

Now at regulation 19 consultation, step 3 of 7. Adoption expected in September 2027, 10 months away.

  1. Early preparation
  2. Regulation 18 consultation
  3. NowRegulation 19 consultation2 Oct 2026
  4. Submitted31 Dec 2026
  5. Examination hearings
  6. Main modifications
  7. AdoptionSep 2027
  1. Early preparation
  2. Regulation 18 consultation
  3. Regulation 19 consultationNow2 Oct 2026
  4. Submitted31 Dec 2026
  5. Examination hearings
  6. Main modifications
  7. AdoptionSep 2027

The Cambridgeshire and Peterborough Minerals and Waste Local Plan review

Being prepared under the plan-making system introduced in 2026, which runs each plan through three gateways in about 30 months.

Now at scoping consultation, step 2 of 9. Adoption expected in February 2030, 3 years and 3 months away.

  1. Notice of intention
  2. NowScoping consultation3 Aug 2026
  3. Gateway 1
  4. Content and evidence consultation
  5. Gateway 2
  6. Plan consultation
  7. Gateway 3
  8. Examination
  9. AdoptionFeb 2030
  1. Notice of intention
  2. Scoping consultationNow3 Aug 2026
  3. Gateway 1
  4. Content and evidence consultation
  5. Gateway 2
  6. Plan consultation
  7. Gateway 3
  8. Examination
  9. AdoptionFeb 2030

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-10-05 (6 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 316 appeals against Peterborough's decisions and allowed 77 of them (24%), against 31% across all councils. For major schemes, 4 of 9 were allowed (44%, against 50% across all councils).

YearDecidedAllowedShare allowed
20194013 (33%)
2020217 (33%)
2021235 (22%)
20223410 (29%)
2023367 (19%)
2024388 (21%)
2025375 (14%)
2026234 (17%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Peterborough's own pages

Land supply around Peterborough

Amber Valley: 5.8 yearsAshfield: 3.86 yearsBabergh: 4.68 yearsBedford: 3.35 yearsBlaby: 2.78 yearsBoston: 4.8 yearsBreckland: 2.88 yearsBroxtowe: No current figure publishedCambridge: 2.75 yearsCentral Bedfordshire: 3.93 yearsCharnwood: 3.56 yearsCherwell: 3.1 yearsEast Cambridgeshire: 6.02 yearsEast Lindsey: 2.33 yearsErewash: 1.6 yearsFenland: 6.6 yearsGedling: 3.73 yearsHarborough: 3.1 yearsHinckley and Bosworth: 4.47 yearsHuntingdonshire: 4.28 yearsKing's Lynn and West Norfolk: 6.2 yearsLeicester: No current figure publishedMelton: 7.6 yearsMid Suffolk: 6.73 yearsMilton Keynes: 5.47 yearsNewark and Sherwood: 4.02 yearsNorth Kesteven: 7.1 yearsNorth Norfolk: 7.3 yearsNorth Northamptonshire: 4.35 yearsNorth West Leicestershire: 5.1 yearsNottingham: 6.57 yearsOadby and Wigston: 6.68 yearsPeterborough: 4.38 yearsRugby: 3.4 yearsRushcliffe: 5.1 yearsRutland: 4.34 yearsSouth Cambridgeshire: 7.83 yearsSouth Derbyshire: 5.27 yearsSouth Holland: 4.6 yearsSouth Kesteven: 4.07 yearsStratford-on-Avon: 2.43 yearsWest Northamptonshire: No current figure publishedWest Suffolk: 6.02 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Peterborough

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Peterborough from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.