North Norfolk: housing land supply, local plan and appeals

North Norfolk Council says it can show a 7.3-year supply of housing land, at 31 March 2025, measured against local housing need under the standard method (536 dpa), with the Local Plan requirement of 557 dpa shown alongside it for transparency.

The most recent appeal decision that dealt with land supply, on 30 June 2026, found the council could show five years. Before that, inspectors found it could not, most recently on 15 December 2025.

It scored 54% in the 2025 Housing Delivery Test, and the government's results list the presumption in favour of sustainable development as the consequence.

Its local plan, the North Norfolk Local Plan 2024-2040 (adopted 17 December 2025), was adopted on 17 December 2025. A replacement, the North Norfolk Local Plan 2029-2045, is at Gateway 1, with adoption expected on 30 April 2029.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

North Norfolk Council's latest published position is a 7.3-year supply of deliverable housing land for the period 2025 to 2030, made up of 4,107 homes it expects on deliverable sites. It is measured against local housing need under the standard method (536 dpa), with the Local Plan requirement of 557 dpa shown alongside it for transparency.

This is the latest figure the council has published. Its base date is 31 March 2025, more than 18 months ago.

Other councils in the East of England

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published 2025-09. Checked 2026-11-12 (7 days ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in North Norfolk where the inspector dealt with land supply, and what each one found.

  1. Five years shownNot disputed30 June 2026 - appeal dismissed
    Craymere Manor, Craymere Road, Briston, Melton Constable, Norfolk
    “Therefore, there is no requirement to apply the presumption in favour of sustainable development as required by the Framework”
    Figures given: council 5 years. Decision 6004877
  2. Inspector did not decideDisputed16 December 2025 - appeal allowed
    Land North Of Plumstead Road, Edgefield, Norfolk
    “Even if I were to accept the Council's position that it has a five year supply of housing, I have noted above that this is not a ceiling on development”
    Figures given: council 5.9 years. Decision 3368039
  3. Five years not shownNot disputed15 December 2025 - appeal dismissed
    Land East Of Short Lane, Happisburgh Common, Happisburgh, Norfolk
    “The Council is currently unable to demonstrate a 5 year supply of deliverable housing sites.”
  4. Five years not shownNot disputed25 November 2025 - appeal dismissed
    Land Off Bradfield Road, Trunch, North Walsham, Norfolk
    “The Council cannot currently demonstrate the necessary five-year supply of deliverable housing sites (5YHLS) in accordance with the Framework.”
  5. Five years not shownNot disputed3 October 2025 - appeal dismissed
    Ambrose House, Mill Road, Banningham, Norfolk
    “It is common ground that the Council are unable to demonstrate a 5-year housing land supply and, as such paragraph 11(d) of the Framework is engaged.”
  6. Five years not shownNot disputed12 September 2025 - appeal allowed
    Land North of East Court, Abbey Road, Sheringham, Norfolk
    “The Council acknowledges that it is unable to demonstrate a five year supply of deliverable housing sites”
    Figures given: appellant 3.67 years. Decision 3353881
  7. Five years not shownNot disputed14 August 2025 - appeal dismissed
    Land to the east of Market Street, Tunstead, Norfolk
    “The Council acknowledges that it cannot demonstrate a five year housing land supply.”
  8. Five years not shownNot disputed24 July 2025 - appeal dismissed
    4 The Grove, The Gatehouse, Cromer Road, Norfolk
    “The Council has identified that it cannot currently demonstrate a sufficient supply of housing land, although the deficit is not clearly identified.”

Showing the 8 most recent of 18 decisions in North Norfolk that dealt with land supply. Planther searches and reads all of them for a site.

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. North Norfolk scored 54% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: Presumption in favour of sustainable development.

YearHomes neededHomes delivered
2022 to 2023562348
2023 to 2024560231
2024 to 2025556328

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the North Norfolk Local Plan 2024-2040 (adopted 17 December 2025) and Norfolk Minerals and Waste Local Plan (Norfolk County Council, adopted 20 May 2025), adopted on 17 December 2025, covering 2024 to 2040. It replaced 3 earlier plans, including the North Norfolk Core Strategy incorporating Development Control Policies (2008).

Five made neighbourhood plans; Tunstead with Sco Ruston submitted, Trunch and Hoveton at draft stage, seven more areas designated.

The North Norfolk Local Plan 2029-2045

Being prepared under the plan-making system introduced in 2026, which runs each plan through three gateways in about 30 months.

Now at gateway 1, step 3 of 9. Adoption expected on 30 April 2029, 2 years and 5 months away.

  1. Notice of intention30 June 2026
  2. Scoping consultation20 July 2026
  3. NowGateway 130 Oct 2026
  4. Content and evidence consultation12 Apr 2027
  5. Gateway 21 Nov 2027
  6. Plan consultation13 Mar 2028
  7. Gateway 3
  8. Examination
  9. Adoption30 Apr 2029
  1. Notice of intention30 June 2026
  2. Scoping consultation20 July 2026
  3. Gateway 1Now30 Oct 2026
  4. Content and evidence consultation12 Apr 2027
  5. Gateway 21 Nov 2027
  6. Plan consultation13 Mar 2028
  7. Gateway 3
  8. Examination
  9. Adoption30 Apr 2029

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-11-12 (7 days ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 328 appeals against North Norfolk's decisions and allowed 73 of them (22%), against 31% across all councils. For major schemes, 3 of 8 were allowed (38%, against 50% across all councils).

YearDecidedAllowedShare allowed
20193412 (35%)
2020406 (15%)
2021368 (22%)
2022253 (12%)
2023318 (26%)
2024297 (24%)
20253510 (29%)
2026183 (17%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

North Norfolk's own pages

Land supply around North Norfolk

Babergh: 4.68 yearsBassetlaw: 5.31 yearsBedford: 3.35 yearsBoston: 4.8 yearsBraintree: 5.32 yearsBreckland: 2.88 yearsBroadland: 4.37 yearsBuckinghamshire: 0.86 yearsCambridge: 2.75 yearsCentral Bedfordshire: 3.93 yearsCharnwood: 3.56 yearsColchester: 5.05 yearsDoncaster: 6.35 yearsEast Cambridgeshire: 6.02 yearsEast Hertfordshire: 3.55 yearsEast Lindsey: 2.33 yearsEast Riding of Yorkshire: No current figure publishedEast Suffolk: 3.07 yearsFenland: 6.6 yearsGreat Yarmouth: 6.06 yearsHarborough: 3.1 yearsHuntingdonshire: 4.28 yearsIpswich: 3.46 yearsKing's Lynn and West Norfolk: 6.2 yearsKingston upon Hull: 3.16 yearsLincoln: 7.1 yearsLuton: 4.64 yearsMelton: 7.6 yearsMid Suffolk: 6.73 yearsMilton Keynes: 5.47 yearsNewark and Sherwood: 4.02 yearsNorth East Lincolnshire: 3.6 yearsNorth Hertfordshire: 2.43 yearsNorth Kesteven: 7.1 yearsNorth Lincolnshire: No current figure publishedNorth Norfolk: 7.3 yearsNorth Northamptonshire: 4.35 yearsNorth Yorkshire: 2.26 yearsNorwich: 4.37 yearsPeterborough: 4.38 yearsRushcliffe: 5.1 yearsRutland: 4.34 yearsSouth Cambridgeshire: 7.83 yearsSouth Holland: 4.6 yearsSouth Kesteven: 4.07 yearsSouth Norfolk: 4.37 yearsStevenage: 5.59 yearsTendring: 3.52 yearsUttlesford: 5.35 yearsWest Lindsey: 7.1 yearsWest Northamptonshire: No current figure publishedWest Suffolk: 6.02 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in North Norfolk

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about North Norfolk from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.