South Cambridgeshire Council says it can show a 7.83-year supply of housing land, at 1 April 2026, measured against standard method local housing need for South Cambridgeshire alone, because the 2018 Local Plan requirement is more than five years old (NPPF August 2026, Annex D paragraph 8).
The most recent appeal decision that dealt with land supply, on 6 November 2026, found the council could show five years. Before that, inspectors found it could not, most recently on 23 October 2026.
It scored 148% in the 2025 Housing Delivery Test, with no consequence listed.
Its local plan, the South Cambridgeshire Local Plan 2018, was adopted on 27 September 2018. A replacement, the Greater Cambridge Local Plan 2024-2045, is at Regulation 19.
Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.