Horsham: housing land supply, local plan and appeals

Horsham Council says it can show a 1.7-year supply of housing land, at 1 April 2025, measured against standard method local housing need (December 2024 NPPF), short of the five years national policy asks for.

The 12 most recent appeal decisions that dealt with land supply, from 1 June 2026 to 9 November 2026, all found the council could not show five years.

It scored 44% in the 2025 Housing Delivery Test, and the government's results list the presumption in favour of sustainable development as the consequence.

Its local plan, the Horsham District Planning Framework (2015), was adopted on 27 November 2015. A replacement, the Horsham District Local Plan 2023-2040, is at main modifications, with adoption expected in February 2027.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Horsham Council's latest published position is a 1.7-year supply of deliverable housing land for the period 1 April 2025 to 31 March 2030, made up of 2,742 homes it expects on deliverable sites. It is measured against standard method local housing need (December 2024 NPPF).

This is the latest figure the council has published. Its base date is 1 April 2025, more than 18 months ago.

Other councils in the South East

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published December 2025. Checked 2026-10-28 (3 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Horsham where the inspector dealt with land supply, and what each one found.

  1. Five years not shownNot disputed9 November 2026 - appeal dismissed
    Brooklands, New Hall Lane, Small Dole
    “The Council cannot provide a 5-year supply of housing and therefore there is an evidenced unmet need of housing in the District.”
  2. Five years not shownNot disputed4 November 2026 - appeal dismissed
    Land North of Eastlands Lane, Cowfold
    “The Council do not have a 5-year housing land supply.”
  3. Five years not shownNot disputed19 October 2026 - appeal dismissed
    Bentley House, North Heath Lane Industrial Estate, North Heath Lane, Horsham
    “It is common ground between the parties that the Council does not have a 5-year housing land supply and that its housing land supply is equivalent to 1.7 years”
    Figures given: council 1.7 years. Decision 6007051
  4. Five years not shownNot disputed15 October 2026 - appeal dismissed
    The Fords, Bonfire Hill, Southwater
    “It is common ground between the main parties that the Council do not have a 5 year housing land supply.”
  5. Five years not shownDisputed13 October 2026 - appeal dismissed
    Barnards Nursery, Rock Road, Washington
    “The Council cannot demonstrate a five-year housing land supply which would signal that there is a general need for more housing which I give substantial weight.”
    Figures given: council 1.7 years. Decision 6008205
  6. Five years not shownDisputed12 October 2026 - appeal allowed
    Land at High Chaparral, London Road, Washington
    “The Council currently has a 1.7 year supply of housing, which represents a significant housing shortfall.”
    Figures given: council 1.7 years. Decision 6011680
  7. Five years not shownNot disputed10 September 2026 - appeal allowed
    Land East of Spring Gardens, Washington, West Sussex
    “There is no dispute that the Council currently has a significant shortfall in housing land supply, so Policy S5 part 1j is also relevant”
  8. Five years not shownNot disputed24 August 2026 - appeal allowed
    Land adjacent to Cedar Cottage, Furners Lane, Henfield, West Sussex
    “Set against the total housing requirement, the Council's Authority Monitoring Report December 2025 demonstrates a 1.7 years' supply of housing land.”
    Figures given: council 1.7 years, inspector 1.7 years. Decision 6007104

Showing the 8 most recent of 58 decisions in Horsham that dealt with land supply. Planther searches and reads all of them for a site.

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Horsham scored 44% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: Presumption in favour of sustainable development.

YearHomes neededHomes delivered
2022 to 2023948414
2023 to 2024911461
2024 to 2025917342

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Horsham District Planning Framework (2015), Site Specific Allocations of Land (2007), West of Bewbush Joint Area Action Plan (2009), West Sussex Joint Minerals Local Plan and Waste Local Plan and Made neighbourhood plans, adopted on 27 November 2015, covering 2011 to 2031. It replaced 2 earlier plans, including the Core Strategy (2007).

24 made neighbourhood plans cover most of Horsham district's parishes.

The Horsham District Local Plan 2023-2040

Being prepared under the plan-making system in place before 2026.

Now at main modifications, step 6 of 7. Adoption expected in February 2027, 3 months away.

  1. Early preparation
  2. Regulation 18 consultation
  3. Regulation 19 consultation19 Jan 2024
  4. Submitted26 July 2024
  5. Examination hearings10 Dec 2024
  6. NowMain modifications13 July 2026
  7. AdoptionFeb 2027
  1. Early preparation
  2. Regulation 18 consultation
  3. Regulation 19 consultation19 Jan 2024
  4. Submitted26 July 2024
  5. Examination hearings10 Dec 2024
  6. Main modificationsNow13 July 2026
  7. AdoptionFeb 2027

The Horsham District 2045

Being prepared under the plan-making system introduced in 2026, which runs each plan through three gateways in about 30 months.

Now at gateway 1, step 3 of 9. Adoption expected in March 2029, 2 years and 4 months away.

  1. Notice of intention25 June 2026
  2. Scoping consultation30 June 2026
  3. NowGateway 131 Oct 2026
  4. Content and evidence consultationJune 2027
  5. Gateway 2Sep 2027
  6. Plan consultation
  7. Gateway 3
  8. Examination
  9. AdoptionMar 2029
  1. Notice of intention25 June 2026
  2. Scoping consultation30 June 2026
  3. Gateway 1Now31 Oct 2026
  4. Content and evidence consultationJune 2027
  5. Gateway 2Sep 2027
  6. Plan consultation
  7. Gateway 3
  8. Examination
  9. AdoptionMar 2029

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-11-08 (11 days ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 781 appeals against Horsham's decisions and allowed 210 of them (27%), against 31% across all councils. For major schemes, 15 of 31 were allowed (48%, against 50% across all councils).

YearDecidedAllowedShare allowed
20197719 (25%)
20206222 (35%)
20216417 (27%)
2022556 (11%)
20237113 (18%)
20245813 (22%)
20259024 (27%)
20265822 (38%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Horsham's own pages

Land supply around Horsham

Adur: 3.2 yearsArun: 3.23 yearsAshford: 3.16 yearsBasingstoke and Deane: 3.2 yearsBexley: 6.02 yearsBracknell Forest: 3.53 yearsBrighton and Hove: No current figure publishedBromley: 1.93 yearsChichester: 5.16 yearsCrawley: 5.4 yearsCroydon: 5.1 yearsDartford: 5.84 yearsEast Hampshire: 2.9 yearsEastbourne: No current figure publishedEastleigh: 4.2 yearsElmbridge: 1 yearsEpsom and Ewell: Says it cannot show five yearsFareham: 2.99 yearsGosport: 1.87 yearsGravesham: 2.53 yearsGreenwich: 3.02 yearsGuildford: 2.98 yearsHart: 2.07 yearsHastings: 1.65 yearsHavant: 1.3 yearsHorsham: 1.7 yearsHounslow: No current figure publishedIsle of Wight: No current figure publishedKingston upon Thames: 1.48 yearsLambeth: 4.21 yearsLewes: 3.02 yearsLewisham: No current figure publishedMaidstone: 4.5 yearsMedway: 3.1 yearsMerton: 5.2 yearsMid Sussex: Says it cannot show five yearsMole Valley: 5.3 yearsNew Forest: 1.53 yearsPortsmouth: 2.4 yearsReading: 3.55 yearsReigate and Banstead: 4.08 yearsRichmond upon Thames: 4.5 yearsRother: 3.04 yearsRunnymede: 2.89 yearsRushmoor: 4.74 yearsSevenoaks: 3.59 yearsSouthampton: No current figure publishedSouthwark: No current figure publishedSpelthorne: 5.3 yearsSurrey Heath: 7.71 yearsSutton: No current figure publishedSwale: No current figure publishedTandridge: 2.17 yearsTest Valley: 2.54 yearsTonbridge and Malling: No current figure publishedTunbridge Wells: 4.7 yearsWandsworth: 5.24 yearsWaverley: 1.28 yearsWealden: 3.65 yearsWest Berkshire: 5.7 yearsWinchester: No current figure publishedWindsor and Maidenhead: 3.53 yearsWoking: 4.57 yearsWokingham: 2.5 yearsWorthing: 6.9 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Horsham

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Horsham from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.