Test Valley: housing land supply, local plan and appeals

Test Valley Council says it can show a 2.54-year supply of housing land, at 1 April 2025, measured against local housing need under the standard method, short of the five years national policy asks for.

The 12 most recent appeal decisions that dealt with land supply, from 15 December 2025 to 6 November 2026, all found the council could not show five years.

It scored 64% in the 2025 Housing Delivery Test, and the government's results list the presumption in favour of sustainable development as the consequence.

Its local plan, the Test Valley Borough Revised Local Plan DPD 2011-2029, was adopted on 27 January 2016. A replacement, the Test Valley Local Plan (new plan-making system), is being prepared, with adoption expected in October 2029.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Test Valley Council's latest published position is a 2.54-year supply of deliverable housing land. It is measured against local housing need under the standard method.

This is the latest figure the council has published. Its base date is 1 April 2025, more than 18 months ago.

Other councils in the South East

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published 2026-01. Checked 2026-10-29 (3 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Test Valley where the inspector dealt with land supply, and what each one found.

  1. Five years not shownNot disputed6 November 2026 - appeal allowed
    Chalklands, Hatchet Lane, Hatherden
    “The Council cannot currently demonstrate a five-year supply of deliverable housing sites”
    Figures given: council 2.54 years. Decision 6011371
  2. Five years not shownNot disputed30 October 2026 - appeal dismissed
    Land to the South of The Bungalow, Wallop Farm, Craydown Lane, Over Wallop
    “the Council cannot currently demonstrate a five-year supply of deliverable housing sites”
    Figures given: council 2.54 years. Decision 6011505
  3. Five years not shownNot disputed17 August 2026 - appeal dismissed
    Pine Lodge, Chilworth Drove, Chilworth, Hampshire
    “The Council has confirmed that it cannot demonstrate a 5-year supply of deliverable housing sites as required by the Framework.”
    Figures given: council 2.54 years, appellant 2.54 years. Decision 6009745
  4. Five years not shownNot disputed6 July 2026 - appeal dismissed
    Larch Gables, Old Stockbridge Road, Middle Wallop, Stockbridge, Hampshire
    “The Council confirms that it is currently unable to demonstrate a 5-year housing land supply.”
  5. Five years not shownNot disputed29 June 2026 - appeal dismissed
    Home Spring, Houghton Road, North Houghton, Stockbridge, Hampshire
    “The Council cannot demonstrate a five-year supply of deliverable housing sites.”
    Figures given: council 2.54 years, appellant 2.54 years. Decision 6006347
  6. Five years not shownNot disputed8 June 2026 - appeal dismissed
    Stepping Stones, Downs Lane, Over Wallop
    “The main parties agree that the Council is unable to demonstrate a five-year land supply of deliverable housing (5YHLS).”
    Figures given: council 2.76 years. Decision 6005115
  7. Five years not shownNot disputed21 May 2026 - appeal dismissed
    33A Shaw Close, Andover, Hampshire
    “The Council is unable to demonstrate a 5-year supply of deliverable housing sites in accordance with Paragraph 72 of the Framework.”
    Figures given: council 2.76 years, inspector 2.76 years. Decision 6002850
  8. Five years not shownNot disputed1 May 2026 - appeal dismissed
    Appledore, The Drive, East Wellow, Romsey
    “The officer report indicates that the Local Planning Authority (LPA) cannot demonstrate a five-year housing land supply.”
    Figures given: council 2.76 years. Decision 6004223

Showing the 8 most recent of 26 decisions in Test Valley that dealt with land supply. Planther searches and reads all of them for a site.

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Test Valley scored 64% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: Presumption in favour of sustainable development.

YearHomes neededHomes delivered
2022 to 2023553396
2023 to 2024550253
2024 to 2025524391

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Test Valley Borough Revised Local Plan DPD 2011-2029 and Made neighbourhood plans, adopted on 27 January 2016, covering 2011 to 2029. It replaced the Test Valley Borough Local Plan 2006.

Test Valley has 11 made neighbourhood plans: Amport (made 8 May 2026), Charlton, Chilbolton, Thruxton and Upper Clatford (all 11 May 2021), Goodworth Clatford (13 March 2019), Houghton (19 May 2022), King's Somborne (10 November 2023), Over Wallop (7 May 2024), Wellow (12 July 2024, a joint plan with the New Forest National Park Authority) and West Dean and West Tytherley (11 May 2022, a joint plan area with Wiltshire Council). A referendum on the Awbridge plan is set for 12 November 2026.

The Test Valley Local Plan (new plan-making system)

Being prepared under the plan-making system introduced in 2026, which runs each plan through three gateways in about 30 months.

Being prepared. Adoption expected in October 2029, 2 years and 11 months away.

  1. Notice of intention
  2. Scoping consultation
  3. Gateway 1
  4. Content and evidence consultation
  5. Gateway 2
  6. Plan consultation
  7. Gateway 3
  8. Examination
  9. AdoptionOct 2029
  1. Notice of intention
  2. Scoping consultation
  3. Gateway 1
  4. Content and evidence consultation
  5. Gateway 2
  6. Plan consultation
  7. Gateway 3
  8. Examination
  9. AdoptionOct 2029

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-10-29 (3 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 385 appeals against Test Valley's decisions and allowed 108 of them (28%), against 31% across all councils. For major schemes, 8 of 17 were allowed (47%, against 50% across all councils).

YearDecidedAllowedShare allowed
2019469 (20%)
2020306 (20%)
20213011 (37%)
2022339 (27%)
2023449 (20%)
20243811 (29%)
20253311 (33%)
2026257 (28%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Test Valley's own pages

Land supply around Test Valley

Adur: 3.2 yearsArun: 3.23 yearsBarnet: No current figure publishedBasingstoke and Deane: 3.2 yearsBath and North East Somerset: 2.5 yearsBournemouth, Christchurch and Poole: 2.55 yearsBracknell Forest: 3.53 yearsBrent: No current figure publishedBrighton and Hove: No current figure publishedBristol: 4.14 yearsBromley: 1.93 yearsBroxbourne: 2.13 yearsBuckinghamshire: 0.86 yearsCamden: 2.8 yearsCherwell: 3.1 yearsChichester: 5.16 yearsCotswold: 1.8 yearsCrawley: 5.4 yearsCroydon: 5.1 yearsDacorum: 1.2 yearsDorset: 2.53 yearsEaling: 5 yearsEast Devon: 3.5 yearsEast Hampshire: 2.9 yearsEast Hertfordshire: 3.55 yearsEastleigh: 4.2 yearsElmbridge: 1 yearsEnfield: 3.1 yearsEpping Forest: No current figure publishedEpsom and Ewell: Says it cannot show five yearsFareham: 2.99 yearsForest of Dean: No current figure publishedGosport: 1.87 yearsGreenwich: 3.02 yearsGuildford: 2.98 yearsHackney: No current figure publishedHammersmith and Fulham: No current figure publishedHaringey: No current figure publishedHarrow: 5.2 yearsHart: 2.07 yearsHavant: 1.3 yearsHertsmere: No current figure publishedHillingdon: 2.5 yearsHorsham: 1.7 yearsHounslow: No current figure publishedIsle of Wight: No current figure publishedIslington: No current figure publishedKensington and Chelsea: 5 yearsKingston upon Thames: 1.48 yearsLambeth: 4.21 yearsLewes: 3.02 yearsLewisham: No current figure publishedCity of London: 7.7 yearsMerton: 5.2 yearsMid Sussex: Says it cannot show five yearsMole Valley: 5.3 yearsNew Forest: 1.53 yearsNewham: No current figure publishedNorth Somerset: 5.05 yearsOxford: 2.88 yearsPortsmouth: 2.4 yearsReading: 3.55 yearsRedbridge: Says it cannot show five yearsReigate and Banstead: 4.08 yearsRichmond upon Thames: 4.5 yearsRunnymede: 2.89 yearsRushmoor: 4.74 yearsSlough: No current figure publishedSomerset: No current figure publishedSouth Gloucestershire: 3.93 yearsSouth Oxfordshire: 4.46 yearsSouthampton: No current figure publishedSouthwark: No current figure publishedSpelthorne: 5.3 yearsSt Albans: 1.12 yearsStroud: No current figure publishedSurrey Heath: 7.71 yearsSutton: No current figure publishedSwindon: 4.9 yearsTandridge: 2.17 yearsTest Valley: 2.54 yearsThree Rivers: 1.19 yearsTower Hamlets: No current figure publishedVale of White Horse: 5.51 yearsWaltham Forest: 5.05 yearsWandsworth: 5.24 yearsWatford: 5.44 yearsWaverley: 1.28 yearsWealden: 3.65 yearsWelwyn Hatfield: 1.8 yearsWest Berkshire: 5.7 yearsWest Oxfordshire: Says it cannot show five yearsWestminster: 5.19 yearsWiltshire: No current figure publishedWinchester: No current figure publishedWindsor and Maidenhead: 3.53 yearsWoking: 4.57 yearsWokingham: 2.5 yearsWorthing: 6.9 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Test Valley

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Test Valley from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.