Tandridge: housing land supply, local plan and appeals

Tandridge Council says it can show a 2.17-year supply of housing land, at 1 October 2025, measured against standard method local housing need (827 homes a year, 993 with the 20% buffer); the 2008 Core Strategy requirement is out of date, short of the five years national policy asks for.

The 12 most recent appeal decisions that dealt with land supply, from 23 June 2026 to 12 November 2026, all found the council could not show five years.

It scored 38% in the 2025 Housing Delivery Test, and the government's results list the presumption in favour of sustainable development as the consequence.

Its local plan, the Tandridge District Core Strategy, was adopted on 24 July 2014. A replacement, the Tandridge District Local Plan, is at Regulation 18, with adoption expected in November 2027.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Tandridge Council's latest published position is a 2.17-year supply of deliverable housing land for the period 2025/26 to 2029/30, made up of 2,158 homes it expects on deliverable sites. It is measured against standard method local housing need (827 homes a year, 993 with the 20% buffer); the 2008 Core Strategy requirement is out of date.

Officer reports to the Planning Committee in April and June 2026 quote 1.97 years against the same requirement of 4,964; the 2.17 years in the monitoring report is the only published calculation. The council's July 2026 consultation document uses a requirement of 819 homes a year.

Other councils in the South East

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published 2025-12. Checked 2026-10-04 (7 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Tandridge where the inspector dealt with land supply, and what each one found.

  1. Five years not shownNot disputed12 November 2026 - appeal dismissed
    Land rear of 75 and 77 Rook Lane, Chaldon
    “There is no dispute that the Council cannot demonstrate a five year housing land supply.”
  2. Five years not shownNot disputed29 October 2026 - appeal allowed
    LAND AT THORNHILL, WESTERHAM ROAD, LIMPSFIELD, OXTED
    “As the Council has no demonstrable five-year housing land supply as required by the Framework”
  3. Five years not shownNot disputed26 October 2026 - appeal dismissed
    31a Banstead Road, Caterham
    “the council confirms that its current five-year housing land supply stands at two years. This represents a significant shortfall.”
  4. Five years not shownDisputed15 October 2026 - appeal dismissed
    Streathbourne House, 75 Redehall Road, Smallfield
    “The Council can only demonstrate 1.92 years of deliverable housing sites”
    Figures given: inspector 1.92 years. Decision 6005184
  5. Five years not shownNot disputed14 October 2026 - appeal dismissed
    Development Site West of Southwood, Waller Lane, CATERHAM
    “it is common ground that the Council cannot demonstrate a five-year housing land supply. The appellant considers the Council has a 2.19-year supply and states that this is evidenced unmet need, a position with which I agree.”
    Figures given: council 2.19 years, appellant 2.19 years. Decision 6008351
  6. Five years not shownNot disputed23 September 2026 - appeal dismissed
    Land Adjacent to Farm View Cottage, Lingfield Road, East Grinstead, Surrey
    “The Council is unable to demonstrate a five-year housing land supply, with an indicated supply of around 1.92 years.”
    Figures given: council 1.92 years. Decision 6008688
  7. Five years not shownNot disputed22 September 2026 - appeal dismissed
    Land adjacent to Oaklands Drive, Copthorne Bank, Copthorne
    “The Council cannot demonstrate a 5 year supply of deliverable housing sites”
    Figures given: appellant 2.17 years. Decision 6011736
  8. Five years not shownNot disputed17 September 2026 - appeal dismissed
    Land South of Warren Lane, Hurst Green
    “It is not in dispute that the Council cannot demonstrate a deliverable supply of five year housing land, with the evidence before me indicating a supply of approximately 2 years.”

Showing the 8 most recent of 59 decisions in Tandridge that dealt with land supply. Planther searches and reads all of them for a site.

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Tandridge scored 38% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: Presumption in favour of sustainable development.

YearHomes neededHomes delivered
2022 to 2023642319
2023 to 2024639238
2024 to 2025634175

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Tandridge District Core Strategy, Tandridge Local Plan Part 2: Detailed Policies and Surrey Waste and Minerals Plans, adopted on 24 July 2014, covering 2014 to 2029. It replaced the Saved policies of the Tandridge District Local Plan 2001.

Four made neighbourhood plans: Woldingham, Limpsfield, Tatsfield, and Caterham/Chaldon/Whyteleafe.

The Tandridge District Local Plan

Being prepared under the plan-making system in place before 2026.

Now at regulation 18 consultation, step 2 of 7. Adoption expected in November 2027, 1 year away.

  1. Early preparation
  2. NowRegulation 18 consultationJan 2026
  3. Regulation 19 consultation
  4. Submitted
  5. Examination hearings
  6. Main modifications
  7. AdoptionNov 2027
  1. Early preparation
  2. Regulation 18 consultationNowJan 2026
  3. Regulation 19 consultation
  4. Submitted
  5. Examination hearings
  6. Main modifications
  7. AdoptionNov 2027

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-10-04 (7 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 816 appeals against Tandridge's decisions and allowed 272 of them (33%), against 31% across all councils. For major schemes, 19 of 41 were allowed (46%, against 50% across all councils).

YearDecidedAllowedShare allowed
20198727 (31%)
20209734 (35%)
20218530 (35%)
20226223 (37%)
20237126 (37%)
20248023 (29%)
20257837 (47%)
20266124 (39%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Tandridge's own pages

Land supply around Tandridge

Ashford: 3.16 yearsBarking and Dagenham: No current figure publishedBarnet: No current figure publishedBasildon: 2.05 yearsBexley: 6.02 yearsBracknell Forest: 3.53 yearsBrent: No current figure publishedBromley: 1.93 yearsBuckinghamshire: 0.86 yearsCamden: 2.8 yearsCastle Point: 0.91 yearsChichester: 5.16 yearsCrawley: 5.4 yearsCroydon: 5.1 yearsDartford: 5.84 yearsEaling: 5 yearsEast Hampshire: 2.9 yearsElmbridge: 1 yearsEpsom and Ewell: Says it cannot show five yearsGravesham: 2.53 yearsGreenwich: 3.02 yearsGuildford: 2.98 yearsHackney: No current figure publishedHammersmith and Fulham: No current figure publishedHarrow: 5.2 yearsHart: 2.07 yearsHavering: 3 yearsHillingdon: 2.5 yearsHorsham: 1.7 yearsHounslow: No current figure publishedIslington: No current figure publishedKensington and Chelsea: 5 yearsKingston upon Thames: 1.48 yearsLambeth: 4.21 yearsLewes: 3.02 yearsLewisham: No current figure publishedCity of London: 7.7 yearsMaidstone: 4.5 yearsMedway: 3.1 yearsMerton: 5.2 yearsMid Sussex: Says it cannot show five yearsMole Valley: 5.3 yearsNewham: No current figure publishedRedbridge: Says it cannot show five yearsReigate and Banstead: 4.08 yearsRichmond upon Thames: 4.5 yearsRochford: 2 yearsRother: 3.04 yearsRunnymede: 2.89 yearsRushmoor: 4.74 yearsSevenoaks: 3.59 yearsSlough: No current figure publishedSouthend-on-Sea: No current figure publishedSouthwark: No current figure publishedSpelthorne: 5.3 yearsSurrey Heath: 7.71 yearsSutton: No current figure publishedSwale: No current figure publishedTandridge: 2.17 yearsThurrock: 1.02 yearsTonbridge and Malling: No current figure publishedTower Hamlets: No current figure publishedTunbridge Wells: 4.7 yearsWaltham Forest: 5.05 yearsWandsworth: 5.24 yearsWaverley: 1.28 yearsWealden: 3.65 yearsWestminster: 5.19 yearsWindsor and Maidenhead: 3.53 yearsWoking: 4.57 yearsWokingham: 2.5 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Tandridge

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Tandridge from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.