Reading: housing land supply, local plan and appeals

Reading Council says it can show a 3.55-year supply of housing land, at 31 March 2025, measured against national standard method for housing need (policy H1 is more than five years old), short of the five years national policy asks for.

The two most recent appeal decisions that dealt with land supply, from 27 February 2026 to 22 September 2026, both found the council could not show five years. Before that, inspectors found it could, most recently on 21 May 2024.

It scored 136% in the 2025 Housing Delivery Test, with no consequence listed.

Its local plan, the Reading Borough Local Plan 2019, was adopted on 31 January 2023. A replacement, the Reading Borough Local Plan Partial Update, is at main modifications.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Reading Council's latest published position is a 3.55-year supply of deliverable housing land for the period 2025/26 to 2029/30, made up of 3,722 homes it expects on deliverable sites. It is measured against national standard method for housing need (policy H1 is more than five years old).

A May 2026 examination paper (EX113) projects 5.06 years at adoption of the Local Plan Partial Update, measured against the draft plan's 825 homes a year, so the position is expected to change on adoption.

This is the latest figure the council has published. Its base date is 31 March 2025, more than 18 months ago.

Other councils in the South East

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published 2026-01. Checked 2026-10-03 (7 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Reading where the inspector dealt with land supply, and what each one found.

  1. Five years not shownNot disputed22 September 2026 - appeal dismissed
    1029 Oxford Road, Tilehurst
    “The parties agree that the Council cannot demonstrate a 5 year housing land supply with supply said to sit at approximately 3.55 years”
    Figures given: council 3.55 years. Decision 6004809
  2. Five years not shownNot disputed27 February 2026 - appeal dismissed
    58 Bath Road, Reading
    “The tilted balance of the National Planning Policy Framework is engaged, due to the lack of a five-year Borough housing land supply.”
  3. Five years shownNot disputed21 May 2024 - appeal allowed
    Land Adjacent to 300 Kings Road, Reading
    “despite the Council being able to demonstrate a five-year housing land supply”
  4. Five years shownNot disputed1 February 2023 - appeal dismissed
    111A Watlington Street, Reading
    “I note the Council has a 5-year supply of deliverable housing sites.”

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Reading scored 136% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: None.

YearHomes neededHomes delivered
2022 to 2023690926
2023 to 20246901,053
2024 to 2025766944

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Reading Borough Local Plan 2019 and Central and Eastern Berkshire Joint Minerals and Waste Plan 2023, adopted on 31 January 2023.

The Reading Borough Local Plan Partial Update

Being prepared under the plan-making system in place before 2026.

Now at main modifications, step 6 of 7.

  1. Early preparation
  2. Regulation 18 consultationNov 2023
  3. Regulation 19 consultationNov 2024
  4. Submitted9 May 2025
  5. Examination hearingsNov 2025
  6. NowMain modifications17 Sep 2026
  7. Adoption
  1. Early preparation
  2. Regulation 18 consultationNov 2023
  3. Regulation 19 consultationNov 2024
  4. Submitted9 May 2025
  5. Examination hearingsNov 2025
  6. Main modificationsNow17 Sep 2026
  7. Adoption

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-10-03 (7 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 354 appeals against Reading's decisions and allowed 93 of them (26%), against 31% across all councils. For major schemes, 10 of 19 were allowed (53%, against 50% across all councils).

YearDecidedAllowedShare allowed
20194213 (31%)
2020345 (15%)
2021203 (15%)
20223111 (35%)
2023206 (30%)
20243210 (31%)
20254211 (26%)
20263211 (34%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Reading's own pages

Land supply around Reading

Basingstoke and Deane: 3.2 yearsBracknell Forest: 3.53 yearsBuckinghamshire: 0.86 yearsGuildford: 2.98 yearsHart: 2.07 yearsReading: 3.55 yearsRushmoor: 4.74 yearsSouth Oxfordshire: 4.46 yearsSurrey Heath: 7.71 yearsVale of White Horse: 5.51 yearsWest Berkshire: 5.7 yearsWindsor and Maidenhead: 3.53 yearsWokingham: 2.5 years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Reading

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Reading from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.