Milton Keynes: housing land supply, local plan and appeals

Milton Keynes Council says it can show a 5.47-year supply of housing land, at 1 April 2024, measured against local housing need, because Plan:MK was more than five years old at the base date; 1,759 a year is the standard method figure from the 2024 NPPF consultation (the council also gives 5.85 years against the 2023 figure of 1,728 a year with no buffer).

The most recent appeal decision that dealt with land supply, on 24 March 2026, found the council could show five years. Before that, inspectors found it could not, most recently on 9 March 2026.

It scored 142% in the 2025 Housing Delivery Test, with no consequence listed.

Its local plan, the Plan:MK 2016-2031, was adopted on 20 March 2019. A replacement, the Minerals and Waste Local Plan 2050, is at the scoping consultation, with adoption expected in August 2029.

Updated 2026-11-17 (2 days ago). Every figure links to where it comes from.

Five-year housing land supply

Milton Keynes Council's latest published position is a 5.47-year supply of deliverable housing land for the period 2024/25 to 2028/29, made up of 10,101 homes it expects on deliverable sites. It is measured against local housing need, because Plan:MK was more than five years old at the base date; 1,759 a year is the standard method figure from the 2024 NPPF consultation (the council also gives 5.85 years against the 2023 figure of 1,728 a year with no buffer).

This is the latest figure the council has published. Its base date is 1 April 2024, more than 18 months ago.

Other councils in the South East

Each council's own latest figure; base dates differ. All councils are on the land supply map of England.

Source: the council's land supply statement, published 2024-10. Checked 2026-10-25 (4 weeks ago).

What inspectors found at appeal

A council's own land supply figure is often tested at appeal. These are the most recent appeal decisions in Milton Keynes where the inspector dealt with land supply, and what each one found.

  1. Five years shownNot disputed24 March 2026 - appeal dismissed
    Lodge Farm, Lower End Road, Wavendon, MILTON KEYNES
    “The Council is able to demonstrate a 5-year housing land supply; however the provision of two dwellings would still be a significant benefit through supplying new homes.”
  2. Five years not shownNot disputed9 March 2026 - appeal allowed
    Land west of High Street, opposite Gun Lane, Sherington, Milton Keynes, Bedfordshire
    “The Council do not have a 5 year supply of traveller sites so the tilted balance from paragraph 11d of the NPPF comes into play”
  3. Five years shownNot disputed19 July 2024 - appeal dismissed
    64-66 and 70 Simpson Road, Fenny Stratford, Bletchley, Milton Keynes
    “The Council can demonstrate a five-year housing land supply with the Council's published figure at just over 6 years supply.”
    Figures given: council 6 years. Decision 3339674
  4. Five years shownNot disputed8 February 2024 - appeal dismissed
    Acorn (MK) Nurseries, Newton Road, Emberton, Olney, Buckinghamshire
    “the Council states its supply of deliverable housing sites exceeds six years and the appellant does not disagree”
    Figures given: council 6 years. Decision 3323492
  5. Five years shownNot disputed10 July 2023 - appeal dismissed
    1 and 2 Highfield, Cranfield Road, Moulsoe, Newport Pagnell
    “In addition, the Council can demonstrate a 5.98-year housing land supply. Consequently, I am satisfied that the policies within PMK are effective”
    Figures given: council 5.98 years, inspector 5.98 years. Decision 3309237

Housing Delivery Test

The Housing Delivery Test compares the homes built in a council's area over three years with the number needed. Milton Keynes scored 142% in the 2025 measurement, published on 17 August 2026. The consequence listed in the government's results is: None.

YearHomes neededHomes delivered
2022 to 20231,7682,895
2023 to 20241,7702,200
2024 to 20251,7282,389

Source: Housing Delivery Test 2025 measurement. Every council's result: Housing Delivery Test results.

Local plan

The development plan is the Plan:MK 2016-2031, Site Allocations Plan (2018), Milton Keynes Minerals Local Plan (2017), Milton Keynes Waste Development Plan Document 2007-2026 and 23 made neighbourhood plans, adopted on 20 March 2019, covering 2016 to 2031. It replaced 2 earlier plans, including the Core Strategy (2013).

23 made neighbourhood plans across 28 designated areas; Bletchley and Fenny Stratford's draft plan was out for consultation in summer 2026.

The Minerals and Waste Local Plan 2050

Being prepared under the plan-making system introduced in 2026, which runs each plan through three gateways in about 30 months.

Now at scoping consultation, step 2 of 9. Adoption expected in August 2029, 2 years and 9 months away.

  1. Notice of intention1 Oct 2026
  2. NowScoping consultation21 Oct 2026
  3. Gateway 1Feb 2027
  4. Content and evidence consultationJuly 2027
  5. Gateway 2
  6. Plan consultationJuly 2028
  7. Gateway 3
  8. ExaminationFeb 2029
  9. AdoptionAug 2029
  1. Notice of intention1 Oct 2026
  2. Scoping consultationNow21 Oct 2026
  3. Gateway 1Feb 2027
  4. Content and evidence consultationJuly 2027
  5. Gateway 2
  6. Plan consultationJuly 2028
  7. Gateway 3
  8. ExaminationFeb 2029
  9. AdoptionAug 2029

The MK City Plan 2050

Being prepared under the plan-making system in place before 2026.

Now at examination hearings, step 5 of 7.

  1. Early preparation
  2. Regulation 18 consultationJuly 2024
  3. Regulation 19 consultation7 Nov 2025
  4. Submitted22 Apr 2026
  5. NowExamination hearings15 Sep 2026
  6. Main modifications
  7. Adoption
  1. Early preparation
  2. Regulation 18 consultationJuly 2024
  3. Regulation 19 consultation7 Nov 2025
  4. Submitted22 Apr 2026
  5. Examination hearingsNow15 Sep 2026
  6. Main modifications
  7. Adoption

Dates from the council's published timetable, its local development scheme.

Source: the council's local plan pages. Checked 2026-10-25 (4 weeks ago). Every council: where each local plan has got to.

Planning appeals

Since 2016, inspectors have decided 443 appeals against Milton Keynes's decisions and allowed 143 of them (32%), against 31% across all councils. For major schemes, 17 of 31 were allowed (55%, against 50% across all councils).

YearDecidedAllowedShare allowed
20194011 (28%)
20204717 (36%)
20214617 (37%)
20223410 (29%)
20233911 (28%)
2024438 (19%)
20254517 (38%)
2026246 (25%)

Decided means allowed, dismissed or split, with a decision date; a split decision counts as decided but not allowed. From the Planning Inspectorate's published decisions.

Milton Keynes's own pages

Land supply around Milton Keynes

Bedford: 3.35 yearsBroxbourne: 2.13 yearsBuckinghamshire: 0.86 yearsCambridge: 2.75 yearsCentral Bedfordshire: 3.93 yearsCherwell: 3.1 yearsCoventry: No current figure publishedDacorum: 1.2 yearsEast Cambridgeshire: 6.02 yearsEast Hertfordshire: 3.55 yearsEpping Forest: No current figure publishedFenland: 6.6 yearsHarborough: 3.1 yearsHarlow: 4.9 yearsHertsmere: No current figure publishedHuntingdonshire: 4.28 yearsLuton: 4.64 yearsMilton Keynes: 5.47 yearsNorth Hertfordshire: 2.43 yearsNorth Northamptonshire: 4.35 yearsNorth Warwickshire: 1.5 yearsOxford: 2.88 yearsRugby: 3.4 yearsSouth Cambridgeshire: 7.83 yearsSouth Oxfordshire: 4.46 yearsSt Albans: 1.12 yearsStevenage: 5.59 yearsStratford-on-Avon: 2.43 yearsThree Rivers: 1.19 yearsUttlesford: 5.35 yearsVale of White Horse: 5.51 yearsWarwick: No current figure publishedWelwyn Hatfield: 1.8 yearsWest Northamptonshire: No current figure publishedWest Oxfordshire: Says it cannot show five years
6 years or more5 to 6 years4 to 5 years, or says it cannot show fiveUnder 4 yearsNo current figure published

Each council's own latest figure. The whole country: land supply map of England.

About this page

Planther keeps track of every council's plan, land supply position and appeal record, and rebuilds this page every night from what it holds. Figures are the council's own unless they are marked as an inspector's. If something here is wrong, email hello@planther.co.uk and we will put it right.

See Planther at work in Milton Keynes

Ask Planther about a site and it does the research: the council's position, the appeals that matter, and a first draft, each point with its source. Here it answers a question about Milton Keynes from the figures on this page.

Book a demo

We will show you round Planther, then set you up with a trial so you can try it on your own work. We can usually have you, or your whole firm, up and running the same day.

Bringing a whole firm? We can work to your own contract and data processing agreement, and invoice you directly.